The Sihuangziping Pilot Geothermal Power Plant (traditional Chinese: 四磺子坪先導地熱發電廠; simplified Chinese: 四磺子坪先导地热发电厂; pinyin: Sìhuángzipíng Xiāndǎo Dìrè Fādiànchǎng) is an upcoming geothermal power plant in Jinshan District, New Taipei, Taiwan. It is the first power plant in Taiwan powered by a volcano.
Sihuangziping Pilot Geothermal Power Plant | |
---|---|
Official name | 四磺子坪先導地熱發電廠 |
Country | |
Location | Jinshan, New Taipei, Taiwan |
Coordinates | 25°11′43.6″N 121°36′08.5″E / 25.195444°N 121.602361°E |
Status | Under construction |
Commission date | October 2023 |
Power generation | |
Nameplate capacity | 1 MW |
Annual net output | 6.4 GWh |
History
editThe power plant will be commissioned by the end of October 2023.[1]
Technical specifications
editThe power plant received its energy sources from Tatun Volcanic Group. It has an installed capacity of 1 MW and can generate 6.4 GWh of electricity per year.[1]
See also
editReferences
edit- ^ a b Wang, Hong-kuo; Hsiao, Alison (10 May 2023). "Taiwan to soon open 1st geothermal plant powered by volcano". Focus Taiwan. Retrieved 6 October 2023.