Silk Institute metro station

Silk Institute is the elevated southern terminal metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India.[1][2] This station was opened on 21 January 2021 to the public. This station is named after Karnataka State Sericulture Research and Development Institute,[3] located at Kanakapura road. The station was inaugurated along with five other stations, as a part of the Green Line extension.[4][5]

Silk Institute
Namma Metro station
A Green Line Namma Metro train at the southern terminus waiting for departure towards Nagasandra in 2022
General information
Other namesVISL Layout
LocationKanakapura Rd, VISL Layout, Talaghattapura, Bengaluru, Karnataka 560062
Coordinates12°51′43″N 77°31′48″E / 12.861858203224118°N 77.53000671267947°E / 12.861858203224118; 77.53000671267947
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Train terminates here
Tracks2
Construction
Structure typeElevated, double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeAPTS
History
Opened21 January 2021; 3 years ago (2021-01-21)[1]
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Thalaghattapura
towards Madavara
Green Line Terminus
Location
Map

Station layout

edit
Silk Institute track layout
 
 
 
 
P1
 
 
 
P2
 
 
 
to Train Terminates Here
 
Station with two tracks and two side platforms
G Street level Exit/entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform 2
Southbound
Towards → Train terminates here
Platform 1
Northbound
Towards ← Madavara
Next station: Thalaghattapura
Side platform | Doors will open on the left  
L2

Entry/exits

edit

There are two entry/exit points – A and B. Commuters can use either for their travel.

  • Entry/exit point A: towards BWSSB (NICE Road) side
  • Entry/exit point B: towards Anjanapura Township side

See also

edit

References

edit
  1. ^ a b "Bengaluru's Namma Metro stretch from Yelachenahalli to Silk Institute launched; open for public from today". The Financial Express. 15 January 2021. Retrieved 1 September 2021.
  2. ^ Philip, Christin Mathew (16 January 2021). "Bengaluru: 5,000 take Yelachenahalli- Silk Institute Metro line on Day 1". The Times of India. Retrieved 28 November 2022.
  3. ^ Karnataka State Sericulture Research and Development Institute
  4. ^ "Namma Metro's 6 Km Yelachenahalli To Silk Institute Stretch Flagged-off". Moneycontrol. Retrieved 1 September 2021.
  5. ^ Christin Mathew Philip (13 January 2021). "Bengaluru: Namma Metro's Sankranti gift brings cheer to Kanakapura Road residents | Bengaluru News - Times of India". The Times of India. Retrieved 1 September 2021.