Siuri Khola Hydropower Station (Nepali:सिउरी खोला जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Lamjung District of Nepal. The flow from Siuri River is used to generate 5 MW electricity. The plant is owned and developed by Nyadi Group Pvt Ltd, an IPP of Nepal. The plant started generating electricity from 2069-06-30 BS. The generation licence will expire in 2101-05-29 BS, after which the plant will be handed over to the government.[1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.[2]
Siuri Khola Hydropower Station | |
---|---|
Official name | Siuri Khola Hydropower Project |
Country | Nepal |
Location | Lamjung District |
Coordinates | 28°20′24″N 84°27′41″E / 28.34000°N 84.46139°E |
Purpose | Power |
Status | Operational |
Owner(s) | Nyadi Group Pvt Ltd |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Siuri River |
Commission date | 2069-06-30 BS |
Type | Run-of-the-river |
Installed capacity | 5 MW |
See also
editReferences
edit- ^ "Operating Projects :: Hydro (Above 1MW)".
- ^ Annual Report 2019/2020. Nepal Electricity Authority.