Slavny was a Kashin-class destroyer of the Soviet Navy.[2][3]
Slavny on 1 October 1985
| |
History | |
---|---|
Soviet Union → Russia | |
Name |
|
Namesake | Glorious in Russian |
Builder | Zhdanov Shipyard, Leningrad |
Laid down | 26 July 1964 |
Launched | 24 April 1965 |
Commissioned | 30 September 1966 |
Decommissioned | 24 June 1991 |
Identification | Pennant number: 487 |
Fate | Scrapped, 1995 |
General characteristics | |
Class and type | Kashin-class destroyer |
Displacement | 3,950 tons standard |
Length | 146 m (479 ft) |
Beam | 15.8 m (52 ft) |
Draught | 4.8 m (16 ft) |
Propulsion | |
Speed | 35 kn (65 km/h; 40 mph) (4 gas turbines on full power) |
Range | 3,500 nmi (6,480 km; 4,030 mi) at 18 kn (33 km/h; 21 mph) |
Complement | 320 |
Armament |
|
Aircraft carried | 1 x Ka-25 series helicopter |
Aviation facilities | Helipad |
Development and design
editLate 1950s and 1960s - this is an era of great changes in the history of the navy, an era of new opportunities and new weapons. This was primarily due to the emergence of sea-based nuclear missiles, which turned submarines into strategic weapons. The appearance of nuclear power plants on submarines has greatly increased their autonomy, cruising range, underwater speed and, as a consequence, the severity of the threat they create.[4]
From the very beginning, two options for the main power plant were considered - a traditional steam turbine (STU) and a gas turbine (GTU). The latter, due to its lightness and compactness (specific gravity 5.2 kg / l. From. Versus 9 kg / l. From.), Reduced the ship's displacement from 3600 to 3200 tons and increased efficiency. In addition, starting from a cold state took 5–10 minutes for the GTU compared to the several hours required for the STU. For these reasons, the option with gas turbine engines was adopted.
The armament of the new ship was innovative. For the first time in Soviet shipbuilding, it was equipped with two anti-aircraft missile systems (M-1 "Volna"). Each complex consisted of a two-boom launcher ZIF-101, a Yatagan control system and a magazine with two rotating drums for 8 V-600 missiles each.[5]
Construction and career
editSlavny was laid down on 26 July 1964, and launched on 24 April 1965 by Zhdanov Shipyard in Leningrad. She was commissioned on 30 September 1966.
On 24 June 1991, she was decommissioned and scrapped in 1995.
Gallery
edit-
Slavny on 1 December 1985.
-
Slavny on 7 February 1986.
References
edit- ^ "Project 61 Kashin class Project 61 Kashin Mod class Guided Missile Destroyer". fas.org. Retrieved 11 November 2015.
- ^ Kostrichenko, V. V. Поющие фрегаты. Large anti-submarine ships - project 61. Prostokishin A. A. Marine collection № 1999-01 (025).
- ^ Nikolsky, V. USSR Navy 1945-1991. Kuzin V.
- ^ Sims P., Bosworth M., Cable C., Fireman H. (March 2005). Historical Review of Cruiser Characteristics, Roles and Missions. Washington D.C.: SFAC Report Nо. 9030-04-C1.
{{cite book}}
: CS1 maint: multiple names: authors list (link) - ^ Kostrichenko, V. V. (1991). Поющие фрегаты. Large anti-submarine ships of project 61. - Series "Морская коллекция". Prostokishin A. A. pp. 1–32.