New York State Route 9A (NY 9A) is a state highway in the vicinity of New York City in the United States. Its southern terminus is at Battery Place near the northern end of the Brooklyn–Battery Tunnel in New York City, where it intersects with both the unsigned Interstate 478 (I-478) and FDR Drive. The northern terminus of NY 9A is at U.S. Route 9 (US 9) in Peekskill. It is predominantly an alternate route of US 9 between New York City and Peekskill; however, in New York City, it is a major route of its own as it runs along the West Side Highway and Henry Hudson Parkway. It is also one of only two signed New York State routes in Manhattan (the other is NY 25). In northern Westchester County, NY 9A follows the Briarcliff–Peekskill Parkway.
Route information | ||||
---|---|---|---|---|
Auxiliary route of US 9 | ||||
Maintained by NYSDOT, NYCDOT, MTAB&T and the City of Yonkers | ||||
Length | 47.25 mi[1] (76.04 km) | |||
Existed | 1930[2]–present | |||
Component highways | Henry Hudson Parkway from Riverside South to Riverdale | |||
Restrictions | No commercial vehicles between exits 8 and 23 | |||
Major junctions | ||||
South end | I-478 / FDR Drive / Battery Place in Battery Park City | |||
| ||||
North end | US 9 in Peekskill | |||
Location | ||||
Country | United States | |||
State | New York | |||
Counties | New York, Bronx, Westchester | |||
Highway system | ||||
| ||||
|
The origins of NY 9A date back to the 1920s when an alternate route of then-NY 6 from Yonkers to Tarrytown was designated as NY 6A. NY 6 was redesignated as US 9 in 1927; however, NY 6A was not renumbered to NY 9A until the 1930 renumbering of state highways in New York. NY 9A was extended south into New York City in 1934 and north to Ossining in the late 1930s. In 1933, the Briarcliff–Peekskill Parkway opened as NY 404. All of NY 404 was incorporated into an extended NY 9A on January 1, 1949. NY 9A was extended northward to Peekskill in 1967 following the completion of the Croton Expressway and southward to the Brooklyn–Battery Tunnel in the mid-1990s.
Route description
editNY 9A begins in Lower Manhattan at Battery Place near the north end of the Brooklyn–Battery Tunnel (unsigned I-478) and heads north on the West Side Highway and Henry Hudson Parkway, crossing US 9 for the first time at the east end of the George Washington Bridge. After crossing into the Bronx via the Triborough Bridge and Tunnel Authority-owned Henry Hudson Bridge, NY 9A proceeds to leave the parkway at exit 23, joining US 9 on Broadway.[3] The portions of NY 9A between Lower Manhattan and 72nd Street, and from 125th Street to the New York City line (with the exception of the Henry Hudson Bridge) are owned by the New York State Department of Transportation, the portion between 72nd and 125th Streets is owned by the New York City Department of Parks & Recreation and the entire highway within city limits is maintained on a daily basis by the New York City Department of Transportation. The concurrency between US 9 and NY 9A runs for 2.87 miles (4.62 km) within the city of Yonkers.[1] All of NY 9A within Yonkers is maintained by the city.[4]
NY 9A separates from US 9 along Ashburton Avenue and heads north as Saw Mill River Road. It parallels the Saw Mill River Parkway through Ardsley and Elmsford, to the west side of Hawthorne. The route meets the southbound New York State Thruway (I-87) at a partial interchange and later meets I-287 (the Cross Westchester Expressway) at a full interchange that provides a route to the northbound Thruway (I-87).[5] NY 100 merges with NY 9A to form a 3.11-mile (5.01 km) concurrency[1] carrying the names Saw Mill River Road and Briarcliff–Peekskill Parkway, parallel to the Taconic State Parkway. NY 9A exits off this highway along the Briarcliff–Peekskill Parkway, while NY 100 continues straight as Saw Mill River Road. NY 9A merges to form a brief concurrency with US 9 as the Croton Expressway in Ossining just south of the Croton River.[5]
The second concurrency between US 9 and NY 9A runs for 1.10 miles, with NY 9A leaving the Croton Expressway at NY 129 in Croton-on-Hudson. The highway heads north along Riverside Avenue and eventually joins old Albany Post Road. After crossing US 9 once more in Cortlandt, NY 9A ends at the Welcher Avenue interchange in southern Peekskill.[5]
History
editOrigins
editPrior to the establishment of the U.S. Highway System, US 9 was designated as NY 6. An alternate route from Yonkers to Tarrytown was assigned the NY 6A designation by 1926. This ran along the present alignment of NY 9A from Yonkers to north of Elmsford, where it turned west on Old Saw Mill River Road, Neperan Road, County House Road and Bedford Road to end at NY 6 in Tarrytown.[6] NY 6 was redesignated as US 9 when U.S. Highways were first posted in New York in 1927; however, NY 6A was not renumbered at this time.[7] It was finally renumbered to NY 9A as part of the 1930 renumbering of state highways in New York.[2]
New York City initially did not mark numbered routes within its limits.[8] In 1932, the New York Automobile Club drafted a plan establishing alignments for several routes through the city. In this plan, NY 9A went south through the Bronx and into Manhattan on Broadway while US 9 used Riverdale Avenue north of 230th Street. As a result, the two routes would have had a short concurrency across Spuyten Duyvil Creek. NY 9A would have split to the south on Tenth Avenue at 218th Street in order to join the Harlem River Drive via Nagle Avenue and Dyckman Street. From there it would head west on 155th Street to Amsterdam Avenue, where it would head south to 79th Street, heading west there to rejoin US 9 at Riverside Drive. US 9 would have continued south through lower Manhattan to Staten Island via the Staten Island Ferry; however, it is unclear whether NY 9A would have continued south with US 9 to lower Manhattan.[9]
The New York Automobile Club released another plan in 1933. This plan made no changes to NY 9A; however, US 9 was changed to use Broadway all the way through the Bronx and to travel to New Jersey by way of the Holland Tunnel.[10] In the final plan implemented in mid-December 1934, no route was assigned to the Harlem River Drive–Amsterdam Avenue corridor. Instead, NY 9A used what had been planned as US 9, splitting at Broadway and Dyckman Street. NY 9A ran south along the west side of Manhattan on Riverside Drive and the West Side Elevated Highway (detouring around an unfinished section via 57th Street, Eleventh Avenue and 48th Street) to end at the entrance and exit plazas of the Holland Tunnel. US 9 was shifted northward to enter New Jersey via the George Washington Bridge.[8]
Westchester County
editIn Westchester County, Saw Mill River Road originally followed the Saw Mill River Parkway corridor from Eastview to Hawthorne. This section of Saw Mill River Road gained a number c. 1931, becoming part of NY 142, a route that began at NY 100 on the Greenburgh–Mount Pleasant town line and followed Grasslands Road, NY 9A, and Saw Mill River Road north to Hawthorne, where it rejoined NY 100.[11][12] The route went unchanged until it was removed c. 1938.[13][14] Its former routing was split into two routes—an extended NY 141 north of NY 9A and the new NY 100C along Grasslands Road—by 1940.[15] NY 9A was extended northward c. 1939 from Tarrytown to Archville, a small hamlet midway between Tarrytown and Ossining, by way of Sleepy Hollow Road.[16][17]
Farther north, a new limited-access parkway was built around Ossining from Saw Mill River Road (NY 100) in Briarcliff Manor to US 9 north of Ossining. The parkway, known as the Briarcliff–Peekskill Parkway, was completed c. 1933 and initially designated as NY 404.[18][19] On January 1, 1949, NY 9A was altered to continue north along a slightly realigned Saw Mill River Road from NY 100C near Elmsford to the south end of the Briarcliff–Peekskill Parkway in Briarcliff Manor. At this point, NY 9A left Saw Mill River Road and followed the parkway to its end at US 9, supplanting NY 404. The realignment created a 3-mile (5 km) overlap between NY 9A and NY 100 from Hawthorne to Briarcliff Manor and resulted in the truncation of NY 141 back to its previous terminus in Hawthorne.[20]
Construction on the Croton Expressway, the only piece of the failed Hudson River Expressway project that was ever built, began in the mid-1960s.[21][22] It became part of a realigned US 9 when it was completed by 1967. The former surface routing of US 9 along Albany Post Road between Croton-on-Hudson and Buchanan became a northward extension of NY 9A, which reached the old alignment by way of an overlap with US 9 from the north end of the Briarcliff–Peekskill Parkway to Croton-on-Hudson.[22]
New York City
editAs the Henry Hudson Parkway replaced Riverside Drive in the mid-1930s, NY 9A was moved onto it, eventually using the new parkway to where it crossed US 9 (Broadway) in the Bronx. Here, NY 9A exited the parkway and ran concurrent with US 9 to the split in Yonkers.[14][23] The Brooklyn–Battery Tunnel connecting Manhattan's Battery Park to Brooklyn was completed in 1950.[24] By 1960, an extension of the West Side Elevated Highway south to the Manhattan tunnel portal became part of NY 27A,[25] which had ended in Brooklyn prior to the construction of the tunnel.[26] On January 1, 1970, NY 27A was truncated on its western end to eastern Nassau County while NY 27 was extended northward over NY 27A's former routing through the Battery Tunnel and the West Side Elevated Highway.[27]
However, by 1973, NY 27 had been cut back to its interchange with the Gowanus Expressway in Brooklyn while unsigned I-478 was assigned to both the Battery Tunnel and all of the West Side Elevated Highway south of the Lincoln Tunnel. NY 9A was cut back to the Lincoln Tunnel as a result.[28][29] The extension of I-478 into Manhattan was eliminated following the collapse of part of the Elevated Highway in 1973,[30] an event which led to the demolition of the highway south of 59th Street. Demolition was completed in 1989.[31] NY 9A was shifted onto 12th Avenue, one of the surface streets that the Elevated Highway had run atop of, but was otherwise unaffected as the route's south end was initially kept at the Lincoln Tunnel.[32][33]
In the mid-1990s, NY 9A was extended south to the Battery Tunnel by way of 12th Avenue and two other streets the Elevated Highway had previously run atop of, West Street and 11th Avenue.[33][34] Construction began in early 1996 on a project to convert the section of NY 9A south of 59th Street into the West Side Highway, a six-lane urban boulevard with a parkway-style median and decorative lightposts. The first of the project's seven segments—between Clarkson and Horatio streets in the Greenwich Village neighborhood—was completed in 1998.[35] Completion of the project was originally set for October 2001; however, it was delayed for years due to damage caused by the September 11 attacks.[36] It was finished by 2014.[37]
After the 9/11 attacks, the area and streets surrounding the World Trade Center, including NY 9A, was damaged and covered with debris when the towers collapsed, subsequently closing the highway and all streets at ground zero. During the construction of the new World Trade Center, both sides of the highway was narrowed with solid lines for lanes, indicating to drivers not to change lanes.[38]
Major intersections
editCounty | Location | mi[1][39] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
Manhattan | Battery Park | 0.00 | 0.00 | Battery Place | Southern terminus | |
Battery Park City | 0.10 | 0.16 | 1 | FDR Drive north (Battery Park Underpass) | Interchange; southbound exit and northbound entrance; southern terminus of FDR Drive | |
0.20– 0.40 | 0.32– 0.64 | 2 | Hugh L. Carey Tunnel (I-478 south) to I-278 – Brooklyn | E-ZPass or Tolls by Mail | ||
Tribeca | 1.45 | 2.33 | 3 | Canal Street to I-78 west (Holland Tunnel) – New Jersey | ||
Greenwich Village | 2.43 | 3.91 | 4 | 10th Avenue – Meat Market | ||
Chelsea | 3.32 | 5.34 | 5 | West 30th Street to NY 495 west (Lincoln Tunnel) – New Jersey | Lincoln Tunnel exit for cars | |
Hell's Kitchen | 4.00 | 6.44 | 6 | West 40th Street / West 42nd Street to NY 495 west (Lincoln Tunnel) – New Jersey | Lincoln Tunnel exit for all vehicles | |
4.66 | 7.50 | 7 | West 56th Street / West 57th Street | Exit number not signed southbound | ||
4.90 | 7.89 | Southern end of freeway section | ||||
8 | West 59th Street – Ship Terminal | Northbound exit only; all trucks must exit | ||||
5.42 | 8.72 | 9 | West 72nd Street | Northbound entrance only | ||
Transition between West Side Highway and Henry Hudson Parkway | ||||||
Riverside Park | 5.73 | 9.22 | 10 | West 79th Street – Boat Basin | Signed as exits 10A (79th Street) and 10B (Boat Basin) northbound; exit number not signed southbound | |
6.56 | 10.56 | 11 | West 95th Street | Southbound exit only; exit number not signed | ||
West 96th Street | No southbound exit; exit number not signed | |||||
Harlem | 7.69 | 12.38 | 12 | West 125th Street | Exit number not signed northbound | |
Hamilton Heights | 9.49 | 15.27 | 13 | West 158th Street | ||
Fort Washington Park | 10.14 | 16.32 | 14 | I-95 / US 1-9 (George Washington Bridge) / Riverside Drive / West 178th Street – Cross Bronx Expressway | Exit 1A on I-95; no northbound access to Riverside Drive; West 178th Street not signed southbound | |
10.39 | 16.72 | 15 | Riverside Drive south | Northbound exit and entrance | ||
Fort Tryon Park | 11.8 | 19.0 | 16 | Fort Tryon Park, Cloisters | Northbound exit and entrance | |
Inwood Hill Park | 12.18 | 19.60 | 17 | Dyckman Street | ||
Spuyten Duyvil Creek (Harlem River) | 12.80– 13.02 | 20.60– 20.95 | Henry Hudson Bridge (toll; E-ZPass or Tolls by Mail) | |||
The Bronx | Spuyten Duyvil | 13.26 | 21.34 | 18 | Kappock Street | No entrance ramps |
13.6 | 21.9 | 19 | West 232nd Street | |||
Riverdale | 14.0 | 22.5 | 20 | West 237th Street / West 239th Street | Signed for 237th Street southbound, 239th Street northbound | |
14.4 | 23.2 | 21 | West 246th Street | No southbound entrance | ||
14.88 | 23.95 | 22 | West 253rd Street / West 254th Street / Riverdale Avenue | Signed for 253rd Street northbound, 254th Street southbound | ||
Fieldston | 15.35 | 24.70 | 23 | US 9 south (Broadway) / Henry Hudson Parkway north – Yonkers | Southern end of US 9 concurrency; northern end of H.H. Parkway concurrency; all trucks must exit | |
Northern end of freeway section | ||||||
Westchester | Yonkers | 18.21 | 29.31 | US 9 north (Broadway) – Hastings-on-Hudson | Northern end of US 9 concurrency | |
Saw Mill River Parkway north to I-87 / New York Thruway / Sprain Brook Parkway | Access to Saw Mill Parkway via Rossiter Avenue; access to I-87/Sprain Parkway via Tuckahoe Road | |||||
Hastings-on-Hudson | To Saw Mill River Parkway north | Access via Farragut Avenue | ||||
Dobbs Ferry | To Saw Mill River Parkway | Access via Lawrence Street | ||||
Ardsley | I-87 south (New York Thruway) – New York City | Exit 7 on I-87 / Thruway | ||||
To Saw Mill River Parkway | Access via Ashford Avenue | |||||
Greenburgh | 25.58 | 41.17 | NY 100B east – White Plains, Greenburgh | Western terminus of NY 100B | ||
Elmsford | 28.13 | 45.27 | NY 119 (East Main Street) – White Plains, Tarrytown | |||
28.41 | 45.72 | I-287 (Cross Westchester Expressway) – White Plains, Rye, Tappan Zee Bridge | Exit 2 on I-287 | |||
Greenburgh–Mount Pleasant town line | 29.54 | 47.54 | NY 100C east / Old Saw Mill River Road to Saw Mill River Parkway | Interchange; western terminus of NY 100C; former routing of NY 9A; Saw Mill Parkway not signed northbound | ||
Mount Pleasant | 30.94 | 49.79 | Saw Mill River Parkway north – Katonah, Brewster | Exit 25 on Saw Mill River Parkway | ||
Hawthorne | 32.00 | 51.50 | Southern end of limited-access section | |||
32.10 | 51.66 | – | NY 100 south / NY 141 north to Bronx River Parkway / Sprain Brook Parkway – Hawthorne, Thornwood | Southern end of NY 100 concurrency; southern terminus of NY 141 | ||
Mount Pleasant | 32.22 | 51.85 | – | Saw Mill River Parkway south – New York City | Southbound exit only | |
33.35 | 53.67 | – | NY 117 – Pleasantville, Sleepy Hollow | |||
33.90 | 54.56 | – | Taconic State Parkway south – New York City | Southbound exit and northbound entrance; exit 5 on Taconic State Parkway | ||
Briarcliff Manor | 35.10 | 56.49 | – | Pleasantville Road | ||
35.40 | 56.97 | – | NY 100 north | Northern end of NY 100 concurrency | ||
35.70 | 57.45 | – | North State Road | At-grade intersection | ||
36.40 | 58.58 | – | Chappaqua Road | At-grade intersection | ||
Village of Ossining | 36.90 | 59.38 | – | NY 133 – Ossining, Millwood | ||
37.20 | 59.87 | – | Ryder Road | Southbound exit and entrance | ||
Town of Ossining | 38.20 | 61.48 | – | NY 134 – Ossining | At-grade intersection | |
38.40 | 61.80 | – | Hawkes Avenue (NY 134) | Northbound exit and entrance | ||
39.00 | 62.76 | – | Cedar Lane | Northbound exit and entrance | ||
39.50 | 63.57 | – | Shady Lane Farm Road – Ossining | Northbound exit only | ||
39.70 | 63.89 | – | US 9 south – Tarrytown | No northbound exit; southern end of US 9 concurrency | ||
– | Croton River Road | Northbound exit and entrance | ||||
Croton-on-Hudson | 40.40 | 65.02 | – | Croton Point Avenue – Croton–Harmon Station | ||
41.10 | 66.14 | – | US 9 north – Peekskill, Yorktown | Northern end of US 9 concurrency | ||
Northern end of limited-access section | ||||||
41.20 | 66.30 | NY 129 east | Western terminus of NY 129 | |||
42.20 | 67.91 | US 9 / Senasaqua Road – Peekskill, Tarrytown | Interchange | |||
Cortlandt | 44.30 | 71.29 | US 9 – Peekskill, Tarrytown | Interchange | ||
Peekskill | 47.90 | 77.09 | US 9 – Bear Mountain Bridge, Tarrytown | Interchange; northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
edit- U.S. roads portal
- New York (state) portal
- New York City portal
- Hudson Valley portal
- New Jersey Route 139, which continued NY 9A back to US 9 in Jersey City when it was US 9 Business.
References
edit- ^ a b c d "2008 Traffic Data Report for New York State" (PDF). New York State Department of Transportation. June 16, 2009. pp. 106–107. Retrieved December 7, 2009.
- ^ a b Automobile Legal Association (ALA) Automobile Green Book, 1930–31 and 1931–32 editions, (Scarborough Motor Guide Co., Boston, 1930 and 1931). The 1930–31 edition shows New York state routes prior to the 1930 renumbering
- ^ 2008 Road Atlas (Map). American Map. p. 80.
- ^ County and State Roads and Parks (PDF) (Map). Westchester County Department of Public Works. 2009. Archived from the original (PDF) on December 29, 2009. Retrieved December 7, 2009.
- ^ a b c "overview map of NY 9A" (Map). Google Maps. Retrieved April 9, 2013.
- ^ Official Map Showing State Highways and other important roads (Map). Cartography by Rand McNally and Company. State of New York Department of Public Works. 1926.
- ^ Automobile Blue Book. Vol. 1 (1927 ed.). Chicago: Automobile Blue Book, Inc. 1927. This edition shows U.S. Routes as they were first officially signed in 1927.
- ^ a b "Mark Ways in the City". The New York Times. December 16, 1934. p. XX12.
- ^ "Through Routes Mapped". The New York Times. March 20, 1932. p. XX6.
- ^ "Routes Through New York City". The New York Times. November 12, 1933.
- ^ Road Map of New York (Map). Cartography by General Drafting. Standard Oil Company of New York. 1930.
- ^ New York (Map). Cartography by H.M. Gousha Company. Kendall Refining Company. 1931.
- ^ Shell Road Map – New York (Map). Cartography by H.M. Gousha Company. Shell Oil Company. 1937.
- ^ a b New York Road Map for 1938 (Map). Cartography by General Drafting. Esso. 1938.
- ^ New York Info-Map (Map). Cartography by Rand McNally and Company. Gulf Oil Company. 1940.
- ^ Thibodeau, William A. (1938). The ALA Green Book (1938–39 ed.). Automobile Legal Association.
- ^ New York (Map). Cartography by General Drafting. Standard Oil Company. 1939.
- ^ Federal Highway Administration (2012). "NBI Structure Number: 1006210". National Bridge Inventory. Federal Highway Administration.
- ^ Texaco Road Map – New York (Map). Cartography by Rand McNally and Company. Texas Oil Company. 1934.
- ^ "State Announces Changes in County; Routes 28 and 209". The Kingston Daily Freeman. Kingston, New York. December 9, 1948. p. 1. Retrieved August 20, 2014 – via Newspapers.com.
- ^ New York and Metropolitan New York (Map). Cartography by Rand McNally and Company. Sinclair Oil Corporation. 1964.
- ^ a b Gousha Road Atlas (Map). H.M. Gousha Company. 1967. Retrieved December 29, 2009.
- ^ Road Map & Historical Guide – New York (Map). Cartography by Rand McNally and Company. Sun Oil Company. 1935.
- ^ Falk, Sam (May 25, 1950). "Tube to Brooklyn Will Open Today". The New York Times. p. 30. Retrieved December 29, 2009.
- ^ New York and New Jersey Tourgide Map (Map). Cartography by Rand McNally and Company. Gulf Oil Company. 1960.
- ^ New York (Map). Cartography by Rand McNally and Company. Socony-Vacuum Oil Company. 1950.
- ^ State of New York Department of Transportation (January 1, 1970). Official Description of Touring Routes in New York State (PDF). Retrieved December 29, 2009.
- ^ New York (Map) (1973 ed.). Cartography by H.M. Gousha Company. Shell Oil Company. 1973.
- ^ Central Park Digital Raster Quadrangle (Map). 1:24,000. New York State Department of Transportation. 1975. Retrieved December 28, 2009.
- ^ Perlmutter, Emanuel (December 17, 1973). "Indefinite Closing Is Set For West Side Highway; Northbound Road Closed". The New York Times. p. 41. Retrieved December 29, 2009.
- ^ Levine, Richard (January 6, 1989). "Highway's Demise: Nightmare for Drivers". The New York Times. p. B1. Retrieved December 29, 2009.
- ^ New York (Map). Rand McNally and Company. 1985. ISBN 0-528-91040-X.
- ^ a b 1996 Traffic Volume Report for New York State, New York State Department of Transportation, p. 30
- ^ New York (Map). Rand McNally and Company. 1995. ISBN 0-528-96764-9.
- ^ Stamler, Bernard (June 21, 1998). "Neighborhood Report: West Side; Route 9A: Long Overdue but Ahead of Schedule". The New York Times. p. 145. Retrieved December 29, 2009.
- ^ "Governor, Mayor Open West Street Promenade South" (Press release). New York State Department of Transportation. July 7, 2006. Retrieved April 9, 2013.
- ^ "9A West Street Promenade". New York State Department of Transportation. Retrieved April 9, 2013.
- ^ "Route 9A Reconstruction". www.stantec.com. Retrieved 2024-06-28.
- ^ "New York State Route 9A" (Map). Google Maps. Retrieved January 9, 2016.
External links
edit- New York State Route 9A at Alps' Roads • New York Routes
- NYCRoads: Briarcliff–Peekskill Parkway – includes formerly proposed extension off NY 9A
- NY 9A (Greater New York Roads)