The Sun Ba Power Plant or Fong Der Power Plant (traditional Chinese: 森霸電廠; simplified Chinese: 森霸电厂; pinyin: Sēnbà Diànchǎng) is a combined cycle gas-fired power plant in Shanshang District, Tainan, Taiwan.[2][3] The installed capacity of the power plant is 980 MW.[4][5]

Sun Ba Power Plant
Map
Official name森霸電廠
CountryRepublic of China
LocationShanshang, Tainan, Taiwan
Coordinates23°04′56″N 120°21′26″E / 23.08222°N 120.35722°E / 23.08222; 120.35722
StatusOperational
Commission date29 March 2004
OwnerSun Ba Power Corporation
OperatorSun Ba Power Corporation
Thermal power station
Primary fuelNatural gas
Power generation
Units operational4 (gas)
2 (steam)
4 (heat recovery steam)
Make and modelMitsubishi Heavy Industries, Toshiba, Babcock-Hitachi[1]
Nameplate capacity980 MW

History

edit

The power plant was commissioned on 29 March 2004. It has an IPP agreement with Taiwan Power Company for 25 years.[6]

See also

edit

References

edit
  1. ^ "台灣汽電共生股份有限公司 Taiwan Cogeneration Corporation". Cogen.com.tw. Retrieved 2014-05-01.
  2. ^ "台灣汽電共生股份有限公司 Taiwan Cogeneration Corporation". Cogen.com.tw. Retrieved 2014-05-01.
  3. ^ "Corporate Information | Power Facilities/ Power Generation". TEPCO. Retrieved 2014-05-01.
  4. ^ "Sun Ba (Fong Der) CCGT Power Plant Taiwan - GEO". Globalenergyobservatory.org. 2010-02-15. Retrieved 2014-05-01.
  5. ^ http://www.tepco.co.jp/en/press/corp-com/release/betu04_e/images/040329e1.pdf [bare URL PDF]
  6. ^ "Overview of TEPCO's participations in the Chang Bin and Fong Der IPP projects" (PDF). TEPCO. Retrieved 6 December 2021.