Syama Hybrid Power Station

The Syama Hybrid Power Station (French: Centrale électrique hybride de Syama) is a planned 70 megawatts hybrid power plant in Mali. The power station is being developed by Aggreko, a company that is based in Glasgow, Scotland, United Kingdom, which supplies temporary power generation equipment. The off-taker is Syama Gold Mine, owned by Resolute Mining, that is based in Perth, Western Australia. The station has thermal, battery storage and solar energy components. Aggreko signed a 16-year agreement with the owners of the gold mine to design, build, operate and maintain this hybrid power station. Under the same agreement, Syra Gold Mine will purchase the electricity generated by the new hybrid plant, as specified in the power purchase agreement.[1][2]

Syama Hybrid Power Station
Map
Official nameCentrale électrique hybride de Syama
CountryMali
LocationSyma, Kadiolo Cercle, Sikasso Region
Coordinates10°47′35″N 06°03′36″W / 10.79306°N 6.06000°W / 10.79306; -6.06000
StatusOperational
Construction began2020
Commission date2021 (1st phase)
2023 (2nd phase)
OwnerSyama Gold Mine
OperatorAggreko
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity70 MW (94,000 hp)

Location

edit

The power station is located near the settlement of Mbembéré, in the Kadiolo Cercle, in Sikasso Region in southern Mali, near the border with Ivory Coast. The power station sits adjacent to the Syama Gold Mine, approximately 83 kilometres (52 mi) southwest of Sikasso, the regional headquarters.[3] This is about 360 kilometres (224 mi) southeast of Bamako, the capital and largest city in the country.[4]

Overview

edit

The phased development of the hybrid power station involves the installation of three Wärtsilä Modular Blocks each rated at 10 megawatts. These units use refined fuel oil (IF0 180), which is cheaper than diesel. A battery storage system rated at 10 megawatts is also installed to smoothen out power fluctuations in the system. These installations totaling 40 megawatts were installed in 2020, with commissioning in 2021.[1][5]

The second phase comprises a fourth 10 megawatts Wärtsilä 32 engine, to be installed in 2022 and a solar power component with 20 megawatts capacity planned to come online in 2023.[1][5]

Benefits

edit

Prior to the development of this hybrid power station, Resolute Mining Limited needed to reduce the cost of power used to operate its underground gold mine in Mali. This was occasioned by the escalating cost of diesel fuel and the need to keep the power supply on 24/7. Connection to the Malian grid was ruled out due to the cost and time it would take to build the necessary transmission infrastructure. This hybrid system, if it works as designed, is expected to reduce power acquisition costs at the mine by 40 percent.[2]

See also

edit

References

edit
  1. ^ a b c Jean Marie Takouleu (28 November 2019). "Mali: Resolute will equip its Syama gold mine with a hybrid off grid thanks to Aggreko". Afrik21.africa. Paris France. Retrieved 23 May 2022.
  2. ^ a b Aggreko (2020). "Worlds largest offgrid mining hybrid power system". Aggreko. Glasgow, Scotland, United Kingdom. Retrieved 23 May 2022.
  3. ^ "Road Distance Between Sikasso, Mali And Syama Gold Mine, Mbembéré, Mali" (Map). Google Maps. Retrieved 23 May 2022.
  4. ^ "Road Distance Between Bamako, Mali And Syama Gold Mine, Mbembéré, Mali" (Map). Google Maps. Retrieved 23 May 2022.
  5. ^ a b Carmen (31 August 2021). "Syama Gold Mining Complex Hybrid Project – Battery Energy Storage System, Mali". Power-Technology.com. New York City. Retrieved 23 May 2022.
edit