This is an archive of past discussions about Eglinton West line. Do not edit the contents of this page. If you wish to start a new discussion or revive an old one, please do so on the current talk page. |
Archive 1 |
Map Error
I've seen maps of the proposed line. Instead of a solid line at the end it branched into two posibilities. It would have either gone from Martin Grove straight to Renforth to connect to the Missasauga Transitway or from Martin Grove northwest to Attwell and Carlingveiw to connect to the Airport. As the line was never built the final allignment was never decided on.