Talk:HVDC BorWin3

Latest comment: 9 years ago by Clampower in topic Merge

Merge

edit

Not long enough or notable enough. Makes more sense to be one big article with sections for 1, 2 and 3. EoRdE6(Come Talk to Me!) 01:47, 22 February 2015 (UTC)Reply

I don't agree - most HVDC projects have their own unique Wikipedia pages, and these offshore HVDC projects are bigger and more complex than normal (some costing over 1B€). Moreover, all three projects in this group have significant technical differences (Borwin1 being radically different from the other two) and are built by two different manufacturers. In my opinion they either need to stay as separate articles or to combine all 9 of the German offshore HVDC projects (from the Dolwin, Helwin, Sylwin and Borwin clusters) into a single article.Clampower (talk) 19:10, 29 April 2015 (UTC)Reply