Talk:Highland Wind Energy Center
This article is rated Stub-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||
|
Blacklisted Links Found on the Main Page
editCyberbot II has detected that page contains external links that have either been globally or locally blacklisted. Links tend to be blacklisted because they have a history of being spammed, or are highly innappropriate for Wikipedia. This, however, doesn't necessarily mean it's spam, or not a good link. If the link is a good link, you may wish to request whitelisting by going to the request page for whitelisting. If you feel the link being caught by the blacklist is a false positive, or no longer needed on the blacklist, you may request the regex be removed or altered at the blacklist request page. If the link is blacklisted globally and you feel the above applies you may request to whitelist it using the before mentioned request page, or request it's removal, or alteration, at the request page on meta. When requesting whitelisting, be sure to supply the link to be whitelisted and wrap the link in nowiki tags. The whitelisting process can take its time so once a request has been filled out, you may set the invisible parameter on the tag to true. Please be aware that the bot will replace removed tags, and will remove misplaced tags regularly.
Below is a list of links that were found on the main page:
- http://wind.energy-business-review.com/news/nordex_usa_completes_highland_wind_farm_in_us_for_everpower_090813/
- Triggered by
-business-review\.com\b
on the local blacklist
- Triggered by
If you would like me to provide more information on the talk page, contact User:Cyberpower678 and ask him to program me with more info.
From your friendly hard working bot.—cyberbot II NotifyOnline 20:08, 8 December 2013 (UTC)
Hijacked
editHope no one minds my hijacking of the seldom visited article from PA to IA. --Aflafla1 (talk) 18:16, 9 May 2014 (UTC)
About the stated capacity factor.
editIn MidAmerica Energy's (MAE) application to PUC, the expected capacity factor was stated as 36%. However at another time, a representative of MAE stated that the capacity factor for the Vienna expansion, near Gladbrook, was expected to be above 38%. Vienna's location is not as good as Highland's and both use a 2.3MW Siemens. so Highland's capacity factor should be higher than 38%. Also I happened across a website that had a calculator for estimating capacity factors for various turbines at Iowa sites, and according to it, the capacity factor for the Highland project should be approaching 50%. IMHO, the capacity factor on the application was a very conservative estimate, and that in reality the capacity factor for this project will be in the 41-46% range in most years. --Aflafla1 (talk) 19:52, 29 May 2014 (UTC)
- A TV news report the other night mentioned the model being used has 108 meter diameter rotor. So it's a large diameter rotor which would confirm good capacity factor. Probably means that low to mid 40 percent capacity factor is doable. --Aflafla1 (talk) 13:15, 4 October 2015 (UTC)