Talk:Linia Hutnicza Szerokotorowa
Latest comment: 11 months ago by MountVic127 in topic Couplers
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||
|
infoboxes
editInfoboxes for Kaliningrad-Hamburg broad-gauge line and Brest-Berlin broad-gauge line are interesting, but these lines are not anywhere near being constructed (or even seriously proposed) at this point, and they do not belong on this page anyway.
I would suggest removing them (and putting them somewhere else?)JustSomePics (talk) 00:49, 29 September 2020 (UTC)
Future proposals
- Full length of track doubling.
- Full length of electrification at 25kV 50Hz AC, with minimum overhead wiring height at 6.75 metres (22 ft 2 in) above rails.
- Extension from Sławków to Germany.
- Extension of broad gauge lines from Brest, Belarus through Warsaw to Berlin, Germany, and from Kaliningrad, Russia through Gdynia, Stettin and Rostock to Hamburg.
|
|
- Are there any references to show that Brest-Berlin and Kaliningrad-Hamburg broad-gauge projects really exist? I am sure one can find some internet forums where such routes are discussed, but has any of the countries involved initiated any serious planning here?
- If not, then the infoboxes give a misleading impression. JustSomePics (talk) 13:53, 1 October 2020 (UTC)
Train weights
editWhat is maximum weight of trains on this line in tonnes. ----MountVic127 (talk) 22:41, 30 November 2023 (UTC)
Couplers
editAre SA3 couplings still used on this broad gauge line? ----MountVic127 (talk) 22:43, 30 November 2023 (UTC)