Talk:Np-chart

Latest comment: 15 years ago by Jayen466 in topic Text removed

Equation should read:

Thank you, well spotted. (Note that you can sign your posts by placing four tildes.) -- Jayen466 00:14, 6 February 2008 (UTC)Reply

Text removed

edit

I've removed the following text that had been added by an IP:


Notice that the using the Central limit theorem approximation is wrong in most cases. The chance that a process will have a sample size big enough and a percentage of defects big enough in order to pass the   approximation test is not very big. In order to calculate Control limits correctly, one must choose an α =1-P(LCL < Xi < UCL/μ=n•p) where Xi = pi•n and extract the control limits using this formula.


This does not seem to be the mainstream position on how to calculate the control limits; at the very least, it is likely to be contentious and should be backed up by a reliable source. JN466 23:13, 12 June 2009 (UTC)Reply