Talk:Oxted line/GA1

Latest comment: 10 hours ago by Steelkamp in topic GA Review

GA Review

edit
GA toolbox
Reviewing

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Nominator: Mertbiol (talk · contribs) 21:10, 21 November 2024 (UTC)Reply

Reviewer: Steelkamp (talk · contribs) 09:28, 28 November 2024 (UTC)Reply


Prose

edit

Lead

edit
  • there is a half-hourly service between London Victoria and East Grinstead, and trains run hourly between London Bridge and Uckfield. -> there is a half-hourly service between London Victoria and East Grinstead, and hourly service between London Bridge and Uckfield. I think this flows better.

Route

edit
  • At Hurst Green Junction, south of Hurst Green station, the line divides, with the electrified tracks running to East Grinstead and unelectrified tracks diverging towards Uckfield. This makes it sound like there are three tracks north of Hurst Green Junction. I suggest rewording to At Hurst Green Junction, south of Hurst Green station, the line splits into two, with an electrified branch running to East Grinstead and an unelectrified branch running to Uckfield.
  • the Uckfield branch was mostly singled south of Hever in 1990. -> the Uckfield branch was mostly converted to single track south of Hever in 1990. I think this would be clearer.
  • and interchange is available with the Bluebell Railway at East Grinstead. Add that the Bluebell Railway is a heritage railway.
  • The station tables shouldn't be collapsed, as per MOS:COLLAPSE.

History

edit

Passenger rolling stock

edit

Freight services

edit

Proposals

edit

Accidents and incidents

edit

Source review

edit