Talk:Port Walcott
Latest comment: 1 year ago by 2406:5A00:BC23:4300:DCC1:36E8:3B6:C129 in topic Port Walcott Upgrades
This article is rated C-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||||||||||||||
|
Text and/or other creative content from this version of Port Walcott was copied or moved into Cape Lambert with this edit on 2 January 2022. The former page's history now serves to provide attribution for that content in the latter page, and it must not be deleted as long as the latter page exists. |
Port Walcott Upgrades
editRio Tinto started a port, rail and mine upgrade in 2012. This include a brand new ore handling facility at Cape Lambert and a second, 4 berth ore wharf approximately 1 kilometer west of the of the existing 4 berth wharf. This took capacity through Cape Lambert to about 203 M tonnes annually by 2015 2406:5A00:BC23:4300:DCC1:36E8:3B6:C129 (talk) 08:28, 22 August 2023 (UTC)