Talk:Process capability index/Archives/2016
Latest comment: 8 years ago by 165.225.34.90 in topic Table for sigma levels
This is an archive of past discussions about Process capability index. Do not edit the contents of this page. If you wish to start a new discussion or revive an old one, please do so on the current talk page. |
Table for sigma levels
Either this table, or the table in the wikipedia article with the following link is wrong: http://en.wikipedia.org/wiki/Six_Sigma#Sigma_levels
I am not an expert, so please someone revise it. --59.66.122.148 (talk) 13:08, 9 January 2014 (UTC)
- No, they're correct. For process capability to be valid, the process must be stable, so yields of Φ(sigma level) - Φ(-sigma level) as given in the table (in the article coupled with this talk page) are correct. As the Six Sigma article indicates, the yields presented there represent the worst case deterioration of 1.5σ before a control chart is expected to catch the shift or drift, so yields of Φ(sigma level - 1.5) - Φ(-sigma level - 1.5) (for a shift or drift upward; a shift or drift downward is equivalent—you can do the math) are correct in that article. No action required. -- DanielPenfield (talk) 10:02, 27 January 2014 (UTC)
Example shown has a std. deviation that seems to not match chart data. Mu hat estimate (98.94) is correct, but estimated chart data std. deviation is ~0.869 (unbiased) or ~0.842 (std. population deviation), not 1.03, as stated.
..unless I am missing something or a different method is used for this? Any comments/clarification very welcomed and appreciated.