Start of debugging run in June 2020
editThere is some progress unmentioned in the article:
"The reactor pressure vessel, steam generator and hot gas duct of the second reactor at the Shidao Bay-1 high-temperature gas-cooled reactor-pebble bed module (HTR-PM) demonstration plant under construction in China have been successfully paired and connected" [1]
Debugging run started in June 2020. The Shidao Bay Nuclear Power Plant, developed by the Tsinghua University it will be connected to the power grid 2021. https://www.youtube.com/watch?v=4vgf5XcTC4g --Manorainjan 10:50, 26 September 2020 (UTC)
References
- ^ "China / CNNC Announces Progress At Generation IV Shidao Bay HTR-PM". NucNet. 5 May 2020. Retrieved 26 September 2020.