Talk:Wetum Road

Latest comment: 4 years ago by 76.8.116.38 in topic Inaccurate date

Inaccurate date

edit

It states that the Wetum road has been constructed since 2008. This is not entirely the case. There was a road constructed in 2008 along the hydro lines from Moosonee to Otter Rapids on the western bank of the Moose and Abitibi rivers but this was built and maintained by Hydro One for that season only. The official Wetum road following along the east bank of the Moose and Abitibi rivers has only been in operation since 2014. — Preceding unsigned comment added by 76.8.116.38 (talk) 15:22, 2 March 2020 (UTC)Reply