Sentosa Express A red-livery Sentosa Express train
Status Operational Owner Sentosa Development Corporation Locale Sentosa , Singapore Stations 4 Type Straddle beam monorail Services 1 Operator(s) Sentosa Development Corporation Depot(s) Beach Rolling stock 7 × 2-car Hitachi small-type monorail Opened 15 January 2007; 17 years ago (2007-01-15 ) Line length 2.1 km (1.3 mi) Character Fully elevated Electrification 750 V DC third rail Operating speed Limit of 50 km/h (31 mph) Signalling Original: Fixed block Hitachi digital ATP /ATS for GoA 1 Current: Moving block Hitachi wireless CBTC ATC under ATO GoA 3 (DTO), with subsystems of ATP, ATS and CBI
VivoCity
Resorts World
Siloso Road
Imbiah
Depot
Beach