This

Test terminal

edit

List of products handeled

edit
  • cargo one
  • cargo two
  • cargo three
  • cargo four
  • cargo five

Special Cargo instructions

edit

Pre inspect wall wash tanks prior to blfewkjfes

Terminal Requirements

edit
  • Tugs :
  • Mooring req'd : 12 lines required
  • Notifications : 2hrs notice for dock man to spot ship. Dock man is PSI contractor.
  • Special : Ships crew must connect shore hose.

Terminal Restrictions

edit
  • Tank entry : OK
  • Tank cleaning : check with terminal
  • Stores : minimal
  • Barging : yes

Security Restrictions

edit
  • Shore leave : only with trasnportation, currently (date here) fee USD xxx for each person
  • Pay phone : no
  • Transportation : agent, seaman's center only
  • Visitors : no
  • Gate : photo ID required

Dock Information

edit
  • cargo one - 8"
  • cargo two - 8"
  • cargo three - 8"
  • cargo four - 4"
  • cargo five - 4"

Side optional

Dock services Available

edit
  • Freshwater no
  • Dry air no
  • Nitrogen no
  • Garbage no

Precautions

edit
  1. Poor moorings, passing ships can break mooring lines -keep lines in sight !
  2. Vapor hose short, vessel should have extra vapor hose (4") if possible
  3. Pre-inspection of tanks loading at other terminals is allowed pending su[pervisor's approval.