User:Cade Stiles/Fontainebleau Las Vegas trimmed and updated

Fontainebleau Las Vegas
Fontainebleau Las Vegas in 2021
Fontainebleau Las Vegas is located in Las Vegas Strip
Fontainebleau Las Vegas
Fontainebleau Las Vegas is located in Nevada
Fontainebleau Las Vegas
Location Winchester, Nevada, U.S.
Address 2777 South Las Vegas Boulevard
Opening dateDecember 13, 2023; 11 months ago (December 13, 2023)
No. of rooms3,644
Total gaming space173,000 sq ft (16,100 m2)
Casino typeLand-based
OwnerFontainebleau Development
Koch Real Estate Investments
ArchitectCarlos Zapata Studio
Previous namesThe Drew Las Vegas (2018–2021)
Coordinates36°8′15″N 115°9′32″W / 36.13750°N 115.15889°W / 36.13750; -115.15889

The Fontainebleau Las Vegas is a resort and casino under construction on the Las Vegas Strip in Winchester, Nevada. It is a sister property to Fontainebleau Miami Beach, and sits on the 24.5-acre (9.9 ha) site previously occupied by the El Rancho Hotel and Casino and the Algiers Hotel. Ownership and development has changed several times since the project was announced in May 2005. It was originally proposed by developer Fontainebleau Resorts, owned by Jeff Soffer.

The project was designed by Carlos Zapata Studio with Bergman Walls and Associates as the executive architect. Construction began in February 2007, and the hotel tower was topped off on November 14, 2008. The tower rises 68 stories, standing 737 feet high. It is the tallest building in Nevada, excluding the nearby Strat observation tower.

A group of banks had agreed to finance the project, but was sued by Fontainebleau in April 2009, after it cut off funding. Construction was put on hold two months later, when the project entered Chapter 11 bankruptcy. The Fontainebleau was 70-percent completed, and the opening had been scheduled for October 2009. Carl Icahn purchased the project out of bankruptcy in 2010, but never restarted construction. Seven years later, the unfinished resort was sold to investment firms Witkoff Group and New Valley LLC, which planned to open it as The Drew Las Vegas in 2022. However, construction stopped in March 2020, due to the COVID-19 pandemic in Nevada.

In February 2021, Soffer bought back the project through his company Fontainebleau Development, with Koch Real Estate Investments as a partner. Soffer reinstated the original name of the project, with construction resuming in November 2021. The resort is scheduled to open on December 13, 2023, and will include a 173,000 sq ft (16,100 m2) casino and 3,644 hotel rooms.

History

edit

Early days: 1948 - 2005

edit
 
Fontainebleau logo (2008)

The property was initially occupied by the Thunderbird hotel and casino, opened in 1948. It was later renamed as the Silverbird, and then as the El Rancho, before closing in 1992.[5] Turnberry Associates purchased the 21-acre (8.5 ha)[6] property in 2000, for $45 million. The company imploded the El Rancho later that year, to make room for a London-themed resort. The project was ultimately cancelled because of an economic downturn caused by the September 11 attacks.[5][7]

A privately held company known as Fontainebleau Resorts was later co-founded by Jeff Soffer, who was the chairman and majority owner of Turnberry Associates.[8] In March 2005, Turnberry Associates paid $97 million to purchase 3.6 acres (1.5 ha) of adjacent property – south of the former El Rancho – that had previously been occupied by the Algiers Hotel. The Algiers was to be replaced by the Krystle Sands, a high-rise condominium project that was cancelled earlier that month.[9][6][10] The purchase gave Fontainebleau Resorts and Turnberry a total of 25 acres (10 ha).[7]

Fontainebleau Resorts and Turnberry announced the Fontainebleau Las Vegas on May 12, 2005, as a casino and hotel resort.[7][11] The project would be a sister property to the Fontainebleau Miami Beach hotel, purchased by Fontainebleau Resorts earlier that year. The Las Vegas location would be the second in a planned chain of Fontainebleau resorts.[12] It would be built on the former property of the El Rancho and Algiers, located immediately west of the Turnberry Place high-rise condominium complex. Groundbreaking was initially expected to occur by March 2006, with the project planned to be opened by 2008.[7][11] At the time, the company was considering the addition of condominiums to the project, but was still working on the final design plans.[11] Glenn Schaeffer, the former president of Mandalay Resort Group, was hired to oversee the new project as the president and chief executive officer of Fontainebleau Resorts.[7][11]

The Fontainebleau was designed by Carlos Zapata Studio, with Bergman Walls and Associates serving as the executive architect.[13][14] The resort would have a total of 3.4 million square feet,[15] and would include two dozen restaurants, a performing arts theater, a spa inspired by the Blue Lagoon in Iceland,[13][16][17] and a 300,000 sq ft (28,000 m2) retail mall.[18] Schaeffer predicted that less than one-third of the resort's revenues would come from its casino.[5]

Construction: 2007 - 2008

edit
Window installation in 2008

Turnberry West Construction began construction of the Fontainebleau Las Vegas in February 2007.[19] The company did not do any of its own work, instead relying on a network of subcontractors.[20]

Preparation work on the property was underway in April 2007, although an official groundbreaking ceremony was not held. At that time, the project was expected to cost $2.8 billion. Publishing and Broadcasting Limited purchased 19.6 percent of Fontainebleau Resorts for $250 million to help fund the project.[8][21] In June 2007, Fontainebleau Resorts secured approximately $4 billion from a group of banks to pay off debts and to finish its projects, including the Fontainebleau Las Vegas, which was expected to open in fall 2009.[21] The company Ullico would also provide financing to the project.[20]

In July 2007, a 70-person team of ironworkers stopped working in areas of the resort that they said were unsafe. They resumed work after three days, following the implementation of several safety measures.[22]

The following month, a construction worker died after a 30-foot fall on the property. Several days later, a large concrete slab in the parking garage fell and caused slabs on two lower floors to collapse. No workers were injured or killed in this incident.[19]

 
Fontainebleau and Turnberry Place in 2010

The resort's parking garage was to stand seven stories, with the first two floors to be located underground. In mid-2007, plans were approved to increase the garage to 23 stories.[23] Later that year, residents of Turnberry Place alleged that they were deceived by Turnberry, saying they were never notified of the garage's size increase,[23] which would hamper their views.[24][25] Other residents were concerned about the impact of noise and pollutants from the new project.[23]

Soffer said Turnberry did a "respectful job" of building the Fontainebleau hotel tower away from Turnberry Place residents. Soffer also stated that the property was zoned for a hotel and casino, and said that residents knew such a project would ultimately be built on the property: Turnberry Place residents asked a district judge rule on whether the Clark County Commission should have approved the garage re-design, which was alleged to be in violation of a county ordinance,[23] and the judge ruled in favor of the project, stating that the re-design was legally approved.Cite error: A <ref> tag is missing the closing </ref> (see the help page). standing at 737 feet.[13][15] It is the tallest building in Las Vegas and in the state.[26][27][28][29] The tower was topped off on November 14, 2008. It is a concrete structure that includes 48 elevator shafts.[14]

Financial issues: 2008 - 2009

edit
 
Preview center, located across from the resort

In April 2009, the project filed a $3 billion lawsuit against the group of banking lenders, alleging that they reneged on their agreement to provide $800 million in funding. The banks stated that the loan was terminated because of an unspecified default, a claim that the lawsuit denied.[30][31][32]

The banks largely declined to comment on the case; they denied wrongdoing but did not specify how the project wound up in default.[33] It was later confirmed that the project had gone substantially over its construction budget, and the banks determined that the project was in default under their credit agreement. The banks also alleged that Fontainebleau officials made inaccurate statements to hide the project's financial problems.[34] According to the banks, Fontainebleau wanted $1.3 billion in debt to be forgiven.[35]

The bank group was led by Bank of America,[36] which began negotiating with Fontainebleau shortly after the lawsuit was filed.[37] Through a separate lending group,[36] the project had $130 million to continue construction while the lawsuit proceeded.[36] However, the second group partially pulled its financing in late April 2009, after the first group rescinded its loan on the project. Work was reduced to skeleton crews, and construction proceeded at a slower pace.[36][38] In May 2009, Fontainebleau filed an amendment to its lawsuit, stating that Deutsche Bank, part of the main banking group, had a conflict of interest. The bank had an ownership stake in the upcoming Cosmopolitan resort, also under construction on the Las Vegas Strip. Deutsche Bank was accused of "seeking to destroy the Fontainebleau in order to minimize competition" for the Cosmopolitan. The bank was to provide $80 million to the Fontainebleau.[39][40] The allegations against Deutsche Bank were eventually dropped.[41]

During May 2009, construction consulting firm CCCS International filed a lawsuit against the Fontainebleau, alleging wrongful termination from the project. CCCS was hired as construction manager in 2008. According to the company, Fontainebleau officials said that the project was "severely over budget" and needed a construction manager to provide cost management and auditing services, in order to recover "prior unnecessary overpayments." In its lawsuit, CCCS alleged the discovery of "fraudulent billing practices and inappropriate payment methods" used by the Fontainebleau, stating that this discovery led to its termination. CCCS also alleged that Fontainebleau did not have financing to fund its consulting services, and that the project failed to disclose this. CCCS stated that it was owed more than $1 million. A Fontainebleau spokesman said that CCCS was fired because it failed to perform its duties.[42][43][44]

Corporate layoffs began in May 2009, as a result of the bank group withholding its loan.[45] Schaeffer was among those who left the project, without explanation.[46][47] Schaeffer had been primarily responsible for securing more than $1 billion in loans for the Fontainebleau, and he was to operate the resort's casino.[48]

Bankruptcy

edit

Facing numerous liens and financing problems, the Fontainebleau filed for Chapter 11 bankruptcy on June 9, 2009. The project had 1,000 to 5,000 creditors,[49][50] including various subcontractors who were owed more than $250 million.[15][51] Subcontractors wanted a committee formed to represent them in the bankruptcy proceedings, rather than Turnberry West Construction.[52] The $3 billion lawsuit against the bank group was withdrawn and instead refiled in U.S. bankruptcy court.[33][53] Fontainebleau Las Vegas LLC sought court approval for an immediate $656 million loan from the bank group.[54] However, the banks did not believe that this would be enough to finish construction.[55] Meanwhile, Crown Limited (previously Publishing and Broadcasting Limited) ended any further investment in the Fontainebleau project.[56][57] On June 11, 2009, it was announced that construction had been halted while the project proceeded through bankruptcy.[15]

A month after the bankruptcy filing, term lenders sued the bank group. Turnberry West also filed a lawsuit against its sister company, Fontainebleau Las Vegas LLC, which owned the project. Turnberry West alleged that its liens against the project took priority over those filed by lenders. Both companies were owned by Soffer. [58][59][60] Mediation attempts were unsuccessful, and a judge determined that the case would go to trial.[61][62] After years of lawsuits, courts ruled in Bank of America's favor;[63] and the bank reached a $300 million settlement with lenders.[64]

Prospective buyers and Icahn purchase: 2009 - 2017

edit
Exposed, lower-level portions of the resort in 2011

In June 2009, executives from Apollo Management and Wynn Resorts toured the Fontainebleau facility with an interest in purchasing the project.[65][66][61] Ullico was also in discussions with Fontainebleau to help finance the resort's completion, after already contributing $447.6 million to the project.[20] In September 2009, Penn National Gaming emerged as a prospective buyer.[67][68] Penn had toured the project several times,[69] and it sought a partner to help finish the resort.[70]

In October 2009, a judge overseeing the bankruptcy case ruled that the Fontainebleau project be sold as soon as possible, appointing an examiner to handle the sale.[71] However, the term lenders had wanted the Chapter 11 case converted into a Chapter 7 liquidation.[72] Penn offered $50 million for the project.[69] In November 2009, corporate raider and financier Carl Icahn offered $136 million. A bidding war ensued, and Penn dropped out of the auction in January 2010, after Icahn raised his bid to $156 million.[73][74][75] Meanwhile, real estate developer Luke Brugnara announced that he would place a $170 million bid for the Fontainebleau.

Icahn ultimately won control of the Fontainebleau, taking over ownership in February in 2010. He also paid $45 million in financing fees during bankruptcy proceedings.[76] Icahn was the only qualified person to bid on the project; two other bids were disqualified because they failed to include a deposit.[77][78] While the project sat vacant, it was sometimes used by local firefighters as a training ground for fire drills.[79]

In 2015, Icahn agreed to county requests for an exterior upgrade, including a cosmetic wrap, consisting of fabric and paint.[80]

In November 2015, Icahn listed the Fontainebleau for sale at an asking price of $650 million. The project was listed through the CBRE Group.[81]

The Drew Las Vegas: 2017 - 2021

edit

In August 2017, investment firms Witkoff Group and New Valley LLC purchased the resort for $600 million, with plans to rename it.[82] The purchase and planned improvements were financed through Deutsche Bank, Goldman Sachs and JPMorgan.[83] In subsequent months, the Las Vegas-based Grand Canyon Development Partners became involved with the project, which was referred to as Project Blue in county records at the time.[84][85] Penta Building Group was hired to finish the resort, with construction expected to resume in 2018.[85] Plans to finish the project's design and to obtain a construction loan were expedited in December 2017, after the passage of the Tax Cuts and Jobs Act of 2017.[86][87]

 
The Drew in August 2018

On February 12, 2018, Witkoff and Marriott International announced a partnership to open the renamed project as The Drew Las Vegas in late 2020 with plans to invest $50 million in the project and house hotels from two Marriott brands.[88]</ref>[89][90] The resort was designed by the architecture firm Diller Scofidio + Renfro. [91]

A man trespassed onto the Drew property in March 2018, and sparked a number of fires causing $10 million in damage to several areas, including a ballroom and the 11th floor of the parking garage. The man was later apprehended and charged with arson.[92][93]

In April 2019, Witkoff announced that the opening would be delayed until the second quarter of 2022.[94][91] Bobby Baldwin was announced as the chief executive officer of The Drew Las Vegas in November 2019.[95][96]

Construction was suspended in March 2020, due to the COVID-19 pandemic in Nevada.[97] Contractors filed liens totaling millions of dollars, for allegedly unpaid work,[98] and executives laid off amid the pandemic sued as well.[99]

Return to Fontainebleau: 2021 - present

edit
 
Fontainebleau's "fb" logo signage in 2022.[100]

In February 2021, sixteen years after he first announced it, Jeffrey Soffer bought back the project through his Florida-based company, Fontainebleau Development. The company partnered with Koch Real Estate Investments on the purchase, and various options were under consideration for the property, which was 75-percent complete.[101][102][103] The project was purchased for $350 million,[104] and the property was valued at $615.5 million.[105] Marriott exited the project later in 2021, citing an amicable agreement with Fontainebleau Development, which instead would manage and operate the hotel itself.[106][107]

On November 9, 2021, Fontainebleau Development held a construction commencement ceremony for the project, announcing that it would be renamed Fontainebleau Las Vegas once again,[108][109] with the opening eventually scheduled for December 13, 2023.[110][111] Richardson Construction was hired as general contractor.[108][109] Carlos Zapata Studio remained as the exterior architect, while David Collins Studio handled interior design.[112][113]

Features

edit

Fontainebleau's proposed features include a 173,000 sq ft (16,100 m2) casino,[114] with 42-foot-high ceilings.[115][116] The casino will include 1,300 slot machines, 128 table games, 18,000 sq ft (1,700 m2) of high-limit gaming, and a 14,000 sq ft (1,300 m2) race and sports book.[117] The hotel will include 3,644 hotel rooms.[118] The 96,500 sq ft (8,970 m2) retail area will cover the first two floors,[111] and include approximately 35 high-end retailers.[119][114] The resort will have a focus on conferences, taking advantage of its location near the Las Vegas Convention Center. The property has more than 550,000 sq ft (51,000 m2) of meeting space.[120][121]

The property will also emphasize entertainment.[122][123] It includes a 3,800-seat performing theater,[124] measuring 90,000 sq ft (8,400 m2).[116] Nightclub owner David Grutman will open LIV, a club already present at the Miami Fontainebleau. The Las Vegas location measures 50,000 sq ft (4,600 m2), and will include the 35,000 sq ft (3,300 m2) LIV Beach dayclub, set to open in 2024.[115][116] The pool complex measures 6 acres (2.4 ha) in total,[116] and features seven pools.[125] The tower's top floor will feature a private club overlooking the Strip.[125]

The resort will feature 36 restaurants and bars,[125][126] including the Asian restaurant Komodo as well as Papi Steak, both from Miami.[115] Chef Gabriela Cámara will oversee Cantina Contramar, designed by Frida Escobedo and featuring a Casa Dragones tequila tasting room.[127][128] The property will also feature a food hall, which will include a burger restaurant by chef Josh Capon.[127][128] Alan Yau will open a restaurant at the resort as well.[116] Like the Miami Fontainebleau, the Las Vegas resort includes a 55,000 sq ft (5,100 m2) Lapis Spa and a bar named after Collins Avenue.[111][116]

In media

edit

The Fontainebleau is depicted in the 2014-15 television series Dominion, in which it has become a hydroponic farm known as the Agri-Tower.[129][130]

See also

edit

References

edit
  1. ^ "Cade Stiles/Fontainebleau Las Vegas trimmed and updated". CTBUH Skyscraper Center.
  2. ^ "Emporis building ID 298045". Emporis. Archived from the original on April 22, 2016.
  3. ^ "Cade Stiles/Fontainebleau Las Vegas trimmed and updated". SkyscraperPage.
  4. ^ Cade Stiles/Fontainebleau Las Vegas trimmed and updated at Structurae
  5. ^ a b c Simpson, Jeff (10 June 2007). "Jeff Simpson on why a new resort positioned in the space formerly occupied by the Thunderbird should make money this time". Las Vegas Sun. Retrieved 8 May 2017.
  6. ^ a b Smith, Hubble (March 24, 2005). "Turnberry confirms land buy". Las Vegas Review-Journal. Archived from the original on December 13, 2005.
  7. ^ a b c d e Stutz, Howard (13 May 2005). "Back on the Strip: Developer counts on LV touch". Las Vegas Review-Journal. Archived from the original on 1 January 2006.
  8. ^ a b "Strip project gets new investor". Las Vegas Review-Journal. 17 April 2007. Retrieved 8 May 2017.
  9. ^ Smith, Hubble (March 23, 2005). "Valley high-rise project 'dead in the water'". Las Vegas Review-Journal. Archived from the original on March 24, 2005.
  10. ^ Shubinski, Jennifer (4 April 2005). "Cancellation of condo project spurs lawsuits". Las Vegas Sun. Retrieved 8 May 2017.
  11. ^ a b c d Benston, Liz (12 May 2005). "Turnberry, Schaeffer plan new resort on the Strip". Las Vegas Sun. Retrieved 8 May 2017.
  12. ^ "The Fontainebleau Brand // From the beach to the Strip". Tampa Bay Times. May 31, 2005. Retrieved May 3, 2023.
  13. ^ a b c Illia, Tony (April 1, 2011). "No Luck for Stalled Fontainebleau Las Vegas". Architectural Record. Retrieved March 8, 2021.
  14. ^ a b Nasvki, Joe (January 26, 2009). "Building the Fontainebleau". Concrete Construction. Retrieved March 8, 2021.
  15. ^ a b c d Knightly, Arnold M. (June 12, 2009). "Building halted, resort secured". Las Vegas Review-Journal. Retrieved March 8, 2021.
  16. ^ Benston, Liz (19 January 2009). "Fontainebleau has the cash to keep rising". Las Vegas Sun.
  17. ^ Knightly, Arnold M. (December 17, 2008). "Fontainebleau, what's really up with you?". Las Vegas Review-Journal. Retrieved March 8, 2021.
  18. ^ Knightly, Arnold M. (24 April 2009). "Fontainebleau says $130 million available for construction". Las Vegas Review-Journal.
  19. ^ a b "No one hurt as slabs fall at construction site". Las Vegas Review-Journal. 7 August 2007. Retrieved 8 May 2017.
  20. ^ a b c Illia, Tony (June 15, 2009). "Help on the Way?". Las Vegas Business Press. Archived from the original on June 19, 2009.
  21. ^ a b "Fontainebleau builder lands big financing". Las Vegas Review-Journal. 8 June 2007. Retrieved 8 May 2017.
  22. ^ Berzon, ra; Mishak, Michael (April 13, 2008). "A Cautious Push". Las Vegas Sun. Retrieved March 8, 2021.
  23. ^ a b c d Smith, Hubble (18 October 2007). "Fontainebleau Plans Viewed with Wrath". Las Vegas Review-Journal. Retrieved 8 May 2017.
  24. ^ "Turnberry residents allege turnabout by developer who's ruining their views". Las Vegas Sun. July 23, 2007. Retrieved March 9, 2021.
  25. ^ Benston, Liz (April 22, 2008). "Garage goes up next door, and condo owners want out". Las Vegas Sun. Retrieved March 9, 2021.
  26. ^ "Question of the Day". Las Vegas Advisor. November 14, 2017. Retrieved July 5, 2019. About the 1,150-foot-tall Stratosphere … yes and no. It's the tallest observation tower in the U.S., but through some quirk of definition, it's not a "building" because it's not fully habitable. Thus, second-place Fontainebleau (735 feet) is actually the tallest building in southern Nevada [...]
  27. ^ Kachelriess, Rob (September 19, 2016). "The Worst Eyesores in Las Vegas". Thrillist. Retrieved July 5, 2019. If you don't count the Stratosphere tower, the tallest building in Las Vegas is the Fontainebleau...
  28. ^ Morris, J. D. (November 11, 2015). "Fontainebleau on north Strip for sale". Vegas Inc. Retrieved July 5, 2019. The firm's announcement also highlighted the Fontainebleau's "iconic height" as a selling point: It's one of the tallest structures in the valley, surpassed only by the Stratosphere for prominence on the Las Vegas skyline.
  29. ^ Comen, Evan; Sauter, Michael B. (February 6, 2017). "The Tallest Building in Every State". Yahoo!. Retrieved July 5, 2019.
  30. ^ Benston, Liz (23 April 2009). "Fontainebleau files $3 billion suit over funding". Las Vegas Sun.
  31. ^ "Berkley wants talks with Obama administration on Fontainebleau". Las Vegas Sun. April 27, 2009. Retrieved March 8, 2021.
  32. ^ Green, Steve (April 27, 2009). "In Fontainebleau's PR battle, banks have yet to talk". Las Vegas Sun. Retrieved March 8, 2021.
  33. ^ a b Green, Steve (June 9, 2009). "Fontainebleau developer files for bankruptcy; more jobs cut". Las Vegas Sun. Retrieved March 8, 2021.
  34. ^ Knightly, Arnold M. (June 17, 2009). "Judge puts Fontainebleau lawsuit against banks on fast track". Las Vegas Review-Journal. Retrieved March 8, 2021.
  35. ^ Green, Steve (July 2, 2009). "Court filings shed light on Fontainebleau financing". Las Vegas Sun. Retrieved March 8, 2021.
  36. ^ a b c d Knightly, Arnold (April 30, 2009). "Contractors lay off workers at Fontainebleau while waiting on money". Las Vegas Review-Journal. Retrieved March 8, 2021.
  37. ^ Knightly, Arnold M. (April 28, 2009). "Bank of America negotiating with Fontainebleau to help finance project". Las Vegas Review-Journal. Retrieved March 8, 2021.
  38. ^ "Fontainebleau developer lays off 40 employees". Las Vegas Sun. May 18, 2009. Retrieved March 8, 2021.
  39. ^ Knightly, Arnold M. (May 13, 2009). "Fontainebleau: Deutsche Bank seeking to destroy our project". Las Vegas Review-Journal. Retrieved March 8, 2021.
  40. ^ Benston, Liz (May 12, 2009). "Fontainebleau: Bank wanted to minimize Cosmopolitan competition". Las Vegas Sun. Retrieved March 8, 2021.
  41. ^ Green, Steve (September 17, 2009). "Fontainebleau: Bank no longer 'seeking to destroy' project". Las Vegas Sun. Retrieved March 8, 2021.
  42. ^ Green, Steve (May 14, 2009). "Contractor sues Fontainebleau over firing, says it's owed money". Las Vegas Sun. Retrieved March 8, 2021.
  43. ^ Knightly, Arnold M. (May 15, 2009). "Fontainebleau developer facing another lawsuit". Las Vegas Review-Journal. Retrieved March 8, 2021.
  44. ^ "Consulting Group Sues Las Vegas Luxury Resort". The Wall Street Journal. May 15, 2009. Retrieved March 8, 2021.
  45. ^ Knightly, Arnold (May 18, 2009). "Corporate layoffs begin at Fontainebleau, more cuts likely". Las Vegas Review-Journal. Retrieved March 8, 2021.
  46. ^ "Fontainebleau executive leaves company". Las Vegas Sun. May 29, 2009. Retrieved March 8, 2021.
  47. ^ "Fontainebleau's top executive leaves company". Las Vegas Review-Journal. May 30, 2009. Retrieved March 8, 2021.
  48. ^ Benston, Liz (June 8, 2009). "Outlook for Fontainebleau slides from bad to worse". Las Vegas Sun. Retrieved March 8, 2021.
  49. ^ Knightly, Arnold M. (June 9, 2009). "Fontainebleau Las Vegas files for Chapter 11 bankruptcy". Las Vegas Review-Journal. Retrieved March 8, 2021.
  50. ^ "Fontainebleau Las Vegas files for Ch. 11 bankruptcy". Reuters. 10 June 2009. Archived from the original on February 25, 2014.
  51. ^ Retrieved March 8, 2021:
  52. ^ Green, Steve (June 19, 2009). "Fontainebleau subcontractors say contractor conflicted". Las Vegas Sun. Retrieved March 8, 2021.
  53. ^ Knightly, Arnold M. (June 10, 2009). "Plus side seen in Fontainebleau bankruptcy despite worker layoffs". Las Vegas Review-Journal. Retrieved March 8, 2021.
  54. ^ Green, Steve (June 10, 2009). "Fontainebleau wants expedited hearing on $656 million". Las Vegas Sun. Retrieved March 8, 2021.
  55. ^ Knightly, Arnold M. (July 11, 2009). "Banks say Strip resort faces huge liabilities". Las Vegas Review-Journal. Retrieved March 8, 2021.
  56. ^ Green, Steve (June 10, 2009). "Australian company writes off Fontainebleau ownership interest". Las Vegas Sun. Retrieved March 8, 2021.
  57. ^ Knightly, Arnold M. (June 10, 2009). "Fontainebleau investor has no plans to participate in restructuring". Las Vegas Review-Journal. Retrieved March 8, 2021.
  58. ^ Green, Steve (July 8, 2009). "Fontainebleau fires back, outlines bank dispute". Las Vegas Sun. Retrieved March 8, 2021.
  59. ^ Green, Steve (July 15, 2009). "Fontainebleau contractor says its liens take priority over lenders". Las Vegas Sun. Retrieved March 8, 2021.
  60. ^ Knightly, Arnold M. (July 18, 2009). "Fontainebleau owner suing … err, himself?". Las Vegas Review-Journal. Retrieved March 8, 2021.
  61. ^ a b Green, Steve (September 15, 2009). "Potential buyer in negotiations for stalled Fontainebleau project". Las Vegas Sun. Retrieved March 8, 2021.
  62. ^ "Fontainebleau dispute with banks to be decided in court". Las Vegas Review-Journal. August 28, 2009. Retrieved March 8, 2021.
  63. ^ "BofA Didn't Breach Fontainebleau Lending Contract, Judge Says". www.law360.com. Retrieved 2016-03-10.
  64. ^ "Bank of America agrees to $300 million Fontainebleau settlement". Las Vegas Review-Journal. February 25, 2015. Retrieved March 9, 2021.
  65. ^ Knightly, Arnold M. (June 19, 2009). "Casino groups express interest in Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  66. ^ Knightly, Arnold M. (September 25, 2009). "Fontainebleau lenders pursue liquidation". Las Vegas Review-Journal. Retrieved March 8, 2021.
  67. ^ Stutz, Howard (September 18, 2009). "Analysts: Penn deal for Fontainebleau 'unlikely'". Las Vegas Review-Journal.
  68. ^ Stutz, Howard (October 6, 2009). "Penn National Gaming makes bid for bankrupt Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  69. ^ a b Stutz, Howard (November 18, 2009). "Penn seeks approval to buy Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  70. ^ Stutz, Howard (October 22, 2009). "Penn's interest in Strip persists". Las Vegas Review-Journal. Retrieved March 8, 2021.
  71. ^ Knightly, Arnold M. (October 8, 2009). "Judge names examiner to push for Fontainebleau sale". Las Vegas Review-Journal. Retrieved March 8, 2021.
  72. ^ Knightly, Arnold M. (October 2, 2009). "Stalled Fontainebleau project appears headed for fast-track sale". Las Vegas Review-Journal. Retrieved March 8, 2021.
  73. ^ Stutz, Howard; Knightly, Arnold M. (November 23, 2009). "Fontainebleau Las Vegas has new bidder". Las Vegas Review-Journal. Retrieved March 9, 2021.
  74. ^ Steve Green (23 November 2009). "Carl Icahn offers $156 million for Fontainebleau, outbids Penn National". Las Vegas Sun. Retrieved 29 August 2011.
  75. ^ Stutz, Howard (January 14, 2010). "Penn won't pursue Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  76. ^ Stutz, Howard (February 19, 2010). "Icahn officially the unfinished Fontainebleau's owner". Las Vegas Review-Journal. Retrieved March 9, 2021.
  77. ^ Stutz, Howard (January 20, 2010). "Icahn apparently wins Fontainebleau ownership". Las Vegas Review-Journal. Retrieved March 9, 2021.
  78. ^ Knightly, Arnold M. (January 27, 2010). "Icahn wins auction to buy Fontainebleau for $150 million". Las Vegas Review-Journal. Retrieved March 9, 2021.
  79. ^ Robison, Jennifer (January 28, 2011). "Firefighters conduct drills at Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  80. ^ Retrieved March 9, 2021:
  81. ^ Karmin, Craig; O'Keeffe, Kate (November 12, 2015). "Carl Icahn Looking to Sell the Fontainebleau Las Vegas". The Wall Street Journal. Retrieved March 9, 2021.
  82. ^ Segall, Eli; Velotta, Richard N. (August 29, 2017). "Fontainebleau on Las Vegas Strip sells for $600M". Las Vegas Review-Journal. Retrieved August 29, 2017.
  83. ^ Velotta, Richard N. (January 8, 2020). "Gaming Control Board recommends licensing for owner of The Drew". Las Vegas Review-Journal. Retrieved January 24, 2020.
  84. ^ Langeler, John (December 7, 2017). "Empty Fountainbleau sold to new owner". KLAS-TV. Retrieved December 11, 2017.
  85. ^ a b Segall, Eli (December 13, 2017). "Unfinished Fontainebleau on Las Vegas Strip becomes Project Blue". Las Vegas Review-Journal. Retrieved December 26, 2017.
  86. ^ Carmiel, Oshrat (December 22, 2017). "A Stalled Las Vegas Resort Is Now a Go Thanks to the Tax Overhaul". Bloomberg. Retrieved December 26, 2017.
  87. ^ King, Danny (December 26, 2017). "Las Vegas Fontainbleau site's buyer says tax cut will speed up development". Travel Weekly. Retrieved December 26, 2017.
  88. ^ Segall, Eli (12 February 2018). "Fontainebleau on Las Vegas Strip has new name and opening date". Las Vegas Review-Journal.
  89. ^ Garcia Cano, Regina (February 12, 2018). "Stalled Fontainebleau Casino-Resort to Open in 2020 with New Name". Las Vegas Sun. Retrieved August 4, 2018.
  90. ^ "Marriott International And Witkoff Set To Open Integrated Resort To Be Named The Drew Las Vegas". prnewswire. Marriott International, Inc. February 12, 2018. Retrieved August 4, 2018.
  91. ^ a b Palmeri, Christopher (April 16, 2019). "Vegas Strip's $3.1 Billion Resort Postponed More Than a Year". Bloomberg. Retrieved April 19, 2019.
  92. ^ Torres-Cortez, Ricardo (May 3, 2018). "Man faces arson charge in fire at unfinished north Strip resort". Las Vegas Sun. Retrieved March 9, 2021.
  93. ^ "Man gets 5 years in fires at Strip resort construction site". Las Vegas Sun. August 31, 2020. Retrieved March 9, 2021.
  94. ^ Segall, Eli (16 April 2019). "Opening of Drew Las Vegas pushed back until 2022". Las Vegas Review-Journal.
  95. ^ Schulz, Bailey (November 1, 2019). "Former MGM Resorts exec Bobby Baldwin named CEO of Drew Las Vegas". Las Vegas Review-Journal. Retrieved January 24, 2020.
  96. ^ Seeman, Matthew (November 1, 2019). "Longtime gaming executive named CEO of Drew Las Vegas". KSNV. Retrieved January 24, 2020.
  97. ^ Segall, Eli (March 18, 2020). "Drew Las Vegas on hold, other construction continues amid virus' spread". Las Vegas Review-Journal. Retrieved February 13, 2021.
  98. ^ Segall, Eli (June 16, 2020). "Contractors say they're owed $36M for work done at Drew Las Vegas". Las Vegas Review-Journal. Retrieved March 9, 2021.
  99. ^ Segall, Eli (June 25, 2020). "Laid-off Drew Las Vegas staffers sue owner, claim money owed". Las Vegas Review-Journal. Retrieved March 9, 2021.
  100. ^ Segall, Eli (December 15, 2021). "Fontainebleau letter signage gets initial tryout on Strip tower". Las Vegas Review-Journal. Retrieved August 18, 2022.
  101. ^ Horwath, Bryan (February 12, 2021). "Firm acquires Drew Las Vegas with plans to finish stalled resort project". Las Vegas Sun. Retrieved February 13, 2021.
  102. ^ Segall, Eli (February 11, 2021). "Koch Industries teams with developer to buy Drew on Las Vegas Strip". Las Vegas Review-Journal. Retrieved February 13, 2021.
  103. ^ Gittelsohn, John; Palmeri, Christopher (February 12, 2021). "Koch Industries Buys Stalled Las Vegas Casino Development". Bloomberg. Retrieved February 13, 2021.
  104. ^ Segall, Eli (December 31, 2021). "'Back in my hands': Fontainebleau's original developer to finally finish resort". Las Vegas Review-Journal. Retrieved January 7, 2022.
  105. ^ Segall, Eli (February 22, 2021). "New owners landed Drew Las Vegas through 'deed in lieu'". Las Vegas Review-Journal. Retrieved March 9, 2021.
  106. ^ Segall, Eli (October 15, 2021). "Marriott exits unfinished former Fontainebleau project". Las Vegas Review-Journal. Retrieved November 10, 2021.
  107. ^ "Marriott exits Fontainebleau deal". KSNV. October 14, 2021. Retrieved November 10, 2021.
  108. ^ a b Lochhead, Colton (9 November 2021). "Fontainebleau to open by end of 2023, developer says". Las Vegas Review-Journal.
  109. ^ a b Gillan, Jeff (10 November 2021). "It's official: Work underway at Fontainebleau 2.0". KSNV.
  110. ^ Yamat, Rio (May 2, 2023). "Long-unfinished blue Strip tower sets date for grand opening". Associated Press. Retrieved May 3, 2023.
  111. ^ a b c Ross, McKenna (September 18, 2023). "Fontainebleau sets Las Vegas opening date after 18 years". Las Vegas Review-Journal. Retrieved September 19, 2023.
  112. ^ Wargo, Buck (September 7, 2023). "Fontainebleau Las Vegas touts its luxury design ahead of December opening". CDC Gaming Reports. Retrieved October 4, 2023.
  113. ^ Ross, McKenna (September 7, 2023). "New images show luxury design at Fontainebleau Las Vegas". Las Vegas Review-Journal. Retrieved October 4, 2023.
  114. ^ a b Phenix, Duncan (August 17, 2022). "Fontainebleau Las Vegas retail space revealed as construction progresses". KLAS. Retrieved August 18, 2022.
  115. ^ a b c Sheckells, Melinda (September 18, 2023). "The 16-Year Saga to Build the Fontainebleau, Las Vegas' Hottest New Hotel: 'It Could Be a Very Good Movie'". The Hollywood Reporter. Retrieved September 19, 2023.
  116. ^ a b c d e f Morris, David (September 18, 2023). "A New 67-story Luxury Hotel Is Opening in Las Vegas — With a 6-acre Pool Complex and 36 Bars and Restaurants". Travel + Leisure. Retrieved September 19, 2023.
  117. ^ Stutz, Howard (September 27, 2023). "'We have to make a very good impression:' Fontainebleau prepares for long-awaited December opening". The Nevada Independent. Retrieved October 4, 2023.
  118. ^ Ross, McKenna (May 2, 2023). "Fontainebleau Las Vegas unveils opening, hiring details". Las Vegas Review-Journal. Retrieved May 3, 2023.
  119. ^ Segall, Eli (August 17, 2022). "Fontainebleau Las Vegas shows plans for retail space". Las Vegas Review-Journal. Retrieved August 18, 2022.
  120. ^ Segall, Eli (March 10, 2022). "Inside Fontainebleau Las Vegas: Renderings show plans for Strip resort". Las Vegas Review-Journal. Retrieved March 10, 2022.
  121. ^ Gillan, Jeff (March 9, 2022). "New renderings, info released of the 67-story Fontainebleau Las Vegas". KSNV. Retrieved March 10, 2022.
  122. ^ Horwath, Bryan (February 2, 2022). "New Fontainebleau Las Vegas president looks to 'bring soul to the building'". Las Vegas Sun. Retrieved August 18, 2022.
  123. ^ Katsilometes, John (February 4, 2022). "Fontainebleau reaches for the sky in Strip entertainment planning". Las Vegas Review-Journal. Retrieved August 18, 2022.
  124. ^ Velotta, Richard N. (July 12, 2023). "New details emerge on big Rio renovation, Fontainebleau opening". Las Vegas Review-Journal. Retrieved July 14, 2023.
  125. ^ a b c Palmeri, Christopher (September 18, 2023). "Vegas' Newest Resort Is a $3.7 Billion Palace, 23 Years in the Making". Bloomberg. Retrieved September 19, 2023.
  126. ^ Wright, Johnathan L. (September 18, 2023). "A look at the 36 bars and restaurants going into the Fontainebleau". Las Vegas Review-Journal. Retrieved September 19, 2023.
  127. ^ a b Radke, Brock (September 28, 2023). "The food of Fontainebleau looks like it'll be worth the wait". Las Vegas Weekly. Retrieved October 4, 2023.
  128. ^ a b Wang, Andy (September 18, 2023). "Chefs Gabriela Cámara, Alan Yau and Evan Funke Will Debut Vegas Restaurants at the Fontainebleau". Observer. Retrieved October 4, 2023.
  129. ^ "Question of the Day". Las Vegas Advisor. May 3, 2020. Retrieved March 9, 2021.
  130. ^ "Chapter Five". Syfy. Archived from the original on July 20, 2014.
edit

Category:Casinos in the Las Vegas Valley Category:Companies that filed for Chapter 11 bankruptcy in 2009 Category:Diller Scofidio + Renfro buildings Category:Las Vegas Strip Category:Resorts in the Las Vegas Valley Category:Skyscraper hotels in Winchester, Nevada Category:Unfinished buildings and structures in the United States