User:Huy1984/sandbox/HCMC Metro Line 5

Line 5
Tuyến số 5
L5
Overview
StatusPrepared for construction
LocaleHo Chi Minh City, Vietnam
Termini
Stations21
Service
TypeRapid transit
System Ho Chi Minh City Metro
Operator(s)Management Authority of Urban Railways in Ho Chi Minh City (MAUR)
Depot(s)Hoàng Văn Thụ, Đa Phước
History
Planned openingAfter 2032
Technical
Line length23.4 kilometers (14.5 mi)
Operating speedTop speed: 80 km/h (50 mph)

...

Stations

edit

Line 5 has a total of 21 stations with 14 underground stations and 7 elevated stations.

Phase Station
symbol
Station name Layout Metro transfers Location
Ward District
1 L501 Tân Cảng Underground  1  (under construction) Ward 25 Bình Thạnh
L502 Hàng Xanh  3B  (planned)
L503 Chợ Bà Chiểu Ward 1
L504 Nguyễn Văn Đậu Ward 3 Phú Nhuận
L505 Phú Nhuận  4  (planned) Ward 8
L506 Hoàng Văn Thụ Park  4B-1  (planned) Ward 2 Tân Bình
L507 Lăng Cha Cả  4B  (planned)
L508 Bảy Hiền  2  (under construction) Ward 4
2 L509 Tân Bình Market Ward 7
L510 Bắc Hải Ward 6
L511 Polytechnic University Ward 14 District 10
L512 Feb. 3
L513 University of Medicine and Pharmacy  3A  (planned) Ward 12 District 5
L514 Tùng Thiện Vương Ward 12 District 8
L515 District 8 Terminal Elevated Ward 5
L516 Nguyễn Văn Linh  M2  Monorail 2 (planned) Bình Hưng Bình Chánh
L517 Inner Ringway Phong Phú
L518 Trịnh Quang Nghị
L519 Phong Phú
L520 Đa Phước Đa Phước
L521 New Cần Giuộc bus station

References

edit
edit