Launch Day (Feb 7) | Atlantis successfully launched at 2:45 pm EDT. No early indications of damage or problems. |
||||
Flight day 2 (Feb 8) | Crew completed a 5 hour inspection of the shuttle's heat shield and prepare for Saturday's scheduled docking with the ISS. |
||||
Flight day 3 (Feb 9) | Space Shuttle docked to the ISS at 12:17 pm, and hatches were opened 1:40 pm. EVA 1 delayed until Feb 11 | ||||
Flight day 4 (Feb 10) | Walheim and Love campout in the Quest Joint Airlock for EVA-1 | ||||
Flight day 5 (Feb 11) | EVA-1 began at 9:13 am and ended at 5:11 pm. Columbus module installed. P1 truss nitrogen (N2) tank assembly prepared. | ||||
Flight day 6 (Feb 12) | Walheim and Schlegel campout for EVA-2. Columbus ingress preparation and equipment transfer. | ||||
Flight day 7 (Feb 13) | EVA-2 began at 9:27 am and ended at 4:12 pm. | ||||
Flight day 8 (Feb 14) | Walheim and Love campout for EVA-3. | ||||
Flight day 9 (Feb 15) | EVA-3 began at 8:07 am and ended at 3:32 pm. | ||||
Flight day 10 (Feb 16) | Atlantis reboosted the station's altitude 1.4 miles by firing it's propulsion system for 36 minutes. | ||||
Flight day 11 (Feb 17) | Hatches closed at 1:03 pm. | ||||
Flight day 12 (Feb 18) | Undock from ISS at 4:24 am EST | ||||
Flight day 13 (Feb 19) | |||||
Flight day 14 (Feb 20) Landing | Atlantis landed at Kennedy Space Center's Shuttle Landing Facility at 9:07 am |