Wikipedia:WikiProject Canada Roads/Ontario/2012 goals
Rather than having one set goal, WikiProject Ontario Roads has set three major aspirations for this year. These include bringing all the 400 series highways (including the QEW) up to Good Article standards, converting wiki-coded junction lists into template format and upgrading 66% of the start articles. As always, feel free encouraged to ask questions or ask for assistance on the project talk page. Good luck!
400-Series Highway (and QEW) Good Article Drive
- By 2013, we hope to have all fourteen 400-series highways as well as the QEW up to a minimum of good article standards, as well as being promoted to GA status.
86.7% completed (estimate)
Junction List Template Conversion Drive
- To help maintain consistency, it is hoped that all articles that currently have a manually-typed junction list or table be converted to the new template system. {{ONinttop}} is used for the header row, {{ONint}} for each of the entries (one per row) and {{jctbtm|col=xx}} for the footer, with the number of columns entered if not 4)
100% completed (estimate)
(123/123)
Start Destruction Drive
- Another goal by the end of the year is to upgrade at least two-thirds of the currently 75 Start-Class articles. That means there should be 25 by the end of the year.
144% completed (estimate)
(72/50)