Zhanghewan Pumped Storage Power Station

The Zhanghewan Pumped Storage Power Station is a pumped-storage hydroelectric power station located 50 km (31 mi) southwest of Shijiazhuang in Jingxing County of Hebei Province, China. Construction on the power station began on 6 December 2003 and the first unit was commissioned on 1 February 2009. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir is created by the Zhanghewan Dam on the Gantao River which was built between 1977 and 1980, originally for irrigation. For this project the Zhanhewan Dam was raised 23 m (75 ft). The Zhanghewan Upper Reservoir is on Laoyemiao Mountain, above the west side of the lower reservoir. During periods of low energy demand, such as at night, water is pumped from Zhanghewan Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant serves as a peaking power plant.[1]

Zhanghewan Pumped Storage Power Station
CountryChina
LocationJingxing County, Hebei Province
Coordinates37°46′27.49″N 114°3′30.19″E / 37.7743028°N 114.0583861°E / 37.7743028; 114.0583861
StatusOperational
Construction began2003
Opening date2009
Upper reservoir
CreatesZhanghewan Upper
Total capacity7,700,000 m3 (6,200 acre⋅ft)
Lower reservoir
CreatesZhanghewan Reservoir
Total capacity83,300,000 m3 (67,500 acre⋅ft)
Power Station
Hydraulic head305 m (1,001 ft)
Pump-generators4 x 250 MW Francis pump turbines
Installed capacity1,000 MW
Annual generation1.6 million kWh

The lower reservoir is created by the Zhanghewan Dam, a 77.35 m (253.8 ft) tall gravity dam on the Gantao River. It can withhold up to 83,300,000 m3 (67,500 acre⋅ft). The upper reservoir is created by a 57 m (187 ft) tall and 456 m (1,496 ft) long circular rock-fill dam on Laoyemiao Mountain, to the west of the lower reservoir. It can withhold up to 7,700,000 m3 (6,200 acre⋅ft) of water. Water from the upper reservoir is sent to the 1,200 MW underground power station down near the lower reservoir through four 850 m (2,790 ft) long headrace/penstock pipes. The drop in elevation between the upper and lower reservoir affords a hydraulic head (water drop) of 305 m (1,001 ft).[2]

See also

edit

References

edit
  1. ^ "Summary Environmental Impact Assessment Hebei Zhanghewan Pumped Storage Project in The People's Republic Of China" (PDF). Asian Development Bank. April 2002. Retrieved 19 July 2014.
  2. ^ "Zhanghewan pumped storage power station". HydroChina. Retrieved 19 July 2014.[permanent dead link]