The Zillergründl Dam is an arch dam on the Ziller River in the upper Ziller Valley of Tyrol state, Austria. It lies 16 km (10 mi) east of Mayrhofen. The primary purpose of the dam is hydroelectric power generation and it supports a 360 MW pumped-storage power station. As part of the Zemm-Ziller Development, construction on the dam began in 1981 and, along with the Häusling Pumped Storage Power Plant, it was completed in 1986. The power plant was fully commissioned by 1988. The dam is the second tallest in Austria.[3]

Zillergründl Dam
Zillergründl Dam is located in Austria
Zillergründl Dam
Location of Zillergründl Dam in Austria
CountryAustria
Coordinates47°07′15″N 12°03′43″E / 47.12083°N 12.06194°E / 47.12083; 12.06194
StatusOperational
Construction began1981
Opening date1986
Owner(s)Verbund AG
Dam and spillways
Type of damArch, variable-radius
ImpoundsZiller River
Height186 m (610 ft)
Length502 m (1,647 ft)
Elevation at crest1,850.7 m (6,072 ft)
Width (crest)6 m (20 ft)
Width (base)36 m (118 ft)
Dam volume1,373,000 m3 (1,795,816 cu yd)
Reservoir
CreatesZillergründl Reservoir
Total capacity89,500,000 m3 (72,559 acre⋅ft)
Active capacity88,800,000 m3 (71,991 acre⋅ft)[1]
Catchment area67 km2 (26 sq mi)[2]
Normal elevation1,850 m (6,070 ft)
Häusling Power Plant
Coordinates47°08′46″N 11°58′02″E / 47.14611°N 11.96722°E / 47.14611; 11.96722
Commission date1986-1988
Hydraulic head744 m (2,441 ft)
Turbines2 x 180 MW Francis-type
Installed capacity360 MW
Annual generation179.4 GWh

Design and operation

edit

At an elevation of 1,850.7 m (6,072 ft) above sea level, the Zillergründl is a 186 m (610 ft) tall and 502 m (1,647 ft) long variable-radius arch dam with a structural volume of 1,373,000 m3 (1,795,816 cu yd). The dam is 6 m (20 ft) wide at its crest and 36 m (118 ft) at its base. Its reservoir has a capacity of 89,500,000 m3 (72,559 acre⋅ft), of which 88,800,000 m3 (71,991 acre⋅ft) is active (or "useful") capacity. At normal levels, the reservoir has a catchment area of 67 km2 (26 sq mi). The reservoir operates at elevations from 1,850 m (6,070 ft) to 1,740 m (5,709 ft), which is the draw-down level.[1][2]

Water released from the reservoir reaches the Häusling Power Plant 10 km (6 mi) downstream. The power plant is located at an elevation of 1,060 m (3,478 ft) and contains two 180 MW Francis turbine-generators. It is afforded 744 m (2,441 ft) of hydraulic head given the difference in elevations.[4] Using its pumped-storage capability, the power-station receives water from the Stillupp Reservoir 8 km (5 mi) to the west in an adjacent valley at 47°07′17″N 11°51′58″E / 47.12139°N 11.86611°E / 47.12139; 11.86611 (Stillupp Dam) and pumps it up to the Zillergründl Reservoir. The pumping and replenishment of the reservoir occur at night, during low energy demand periods. The process is repeated; electricity is generated during high-demand periods and pumping occurs during low-demand periods when electricity is cheaper.[3][5][6]

See also

edit

References

edit
  1. ^ a b "Zillergründl Dam Austria" (PDF). STRABAG. Retrieved 7 August 2011.[permanent dead link]
  2. ^ a b "Zillergründl". Austrian National Committee on Large Dams. Retrieved 7 August 2011.[permanent dead link]
  3. ^ a b Jacobs, S.; Blauhut, A.; Schöberl, P. (2009). "Long term deformation of Zillergründl rock foundation" (PDF). Long Term Behaviour of Dams. B (9). Graz University of Technology. Retrieved 7 August 2011.[permanent dead link]
  4. ^ "Hydraulic Machines for hydroelectric stations". ANDRITZ. {{cite web}}: Missing or empty |url= (help)
  5. ^ "HÄUSLING" (in German). ANDRITZ. Retrieved 7 August 2011.
  6. ^ "Our Power Plants - the Heart of VERBUND (See #38)". Verbund AG. Archived from the original on 6 August 2011. Retrieved 7 August 2011.