This article lists events related to rail transport that are currently scheduled to occur in 2025. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events
editJanuary
edit- January 7 – Tampere light rail extension to Lentävänniemi.[1]
- January 19 – Planned opening of the Osaka Metro Chūō Line extension to Yumeshima.[2]
- – Bengaluru Yellow Line to open between Bommasandra-Hosa Road and Bommasandra.[3]
- – New Delhi-Srinagar sleeper train to start operations.[4]
- – Arenaways to launch regional service between Cuneo and Savigliano.[5]
- – Line T1 of the Luxembourg tramway will be extended to Luxembourg Airport-Findel.[6]
- – Buffalo Metro Rail to extend to DL&W station from Canalside.[7]
- – Los Angeles Metro A Line to extend to Pomona from APU/Citrus College.[8][9][10]
February
edit- – Mumbai Metro Line 3 to extend to Acharya Atrey Chowk from Income Tax Office.[11]
March
edit- – Latest planned opening of Patna Metro.[12]
April
edit- – Delhi–Alwar Regional Rapid Transit System to be completed, allowing speeds up to 160 kilometres per hour (99 mph).[13]
- – Toulouse-Barcelona AVE high speed service to commence.[14]
May
edit- – Mumbai Metro Line 3 to extend to Cuffe Parade from Acharya Atrey Chowk.[11]
- – M10 of Istanbul Metro extension from Fevzi Çakmak to Pendik Merkez.[15]
- – South Shore Line West Lake Corridor starts operations between Chicago and Dyer.[16]
June
edit- – Meerut Metro to start operations between Modipuram and Meerut South.[17]
- – Mumbai Metro Line 9 to start operations between Subhash Chandra Bose Stadium and Dahisar East.[18]
August
edit- - LRT Shah Alam Line expected to open [19]
- – Earliest expected MRT Orange Line opening.[20][21]
- – OC Streetcar opens between Santa Ana Regional Transportation Center and Harbor Transit Center.[22]
December
edit- – LAX Automated People Mover opens between LAX and LAX Transit Center.[23]
- – Mumbai Metro Line 4 to start operations between Kasarvadavali and Wadala.[24]
- – Expected completion of East Kilbride Electrificaton.
Unknown date
edit- – Transperth's Armadale and Thornlie lines reopen after an 18-month closure for the Victoria Park-Canning Level Crossing Removal Project.[25] At the same time, the Thornlie–Cockburn Link and the extension of the Armadale line to Byford will open.
- – Metro Tunnel is planned to open, connecting north and south railway lines in Melbourne.[26]
- – Guilin Rail Transit Line 1 to start operations between Liangjiang Airport and Guilin Railway Station.[27]
- – Shanghai Metro is claimed to exceed 1,000 kilometres (620 mi) length.[28]
- – Greater Copenhagen Light Rail opening.[29]
- – Opening of the southern section of Paris Métro Line 15, between Pont de Sèvres and Noisy–Champs.[30]
- – Line 1 of the Bremen tram network is planned to be extended from Roland-Center to Brüsseler Straße in Mittelshuchting.[31]
- – Delhi Metro network to exceed 450 kilometres (280 mi).[32][33]
- – Mumbai Metro Line 6 to start operations between Swami Samarth Nagar and Vikhroli EEH.[34]
- – Mumbai Metro Line 10 to start operations between Shivaji Chowk and Chhatrapati Shivaji Maharaj Terminus.[35]
- – Orient Express La Dolce Vita to start service between Rome and Palermo.[36]
- – Opening of Hiroshima Electric Railway Ekimae Ohashi Line.
- – Line 4 of SITEUR opening.[37]
- – Passenger service on the Line K of the Tren Interoceánico is scheduled to begin first stage: Ixtepec–Arriaga.[38]
- – Projected opening of the Auckland City Rail Link.[39]
- – Jeddah Metro: Blue Line to open from South Jeddah to King Abdulaziz International Airport, Orange Line to open from Obhur Suspension Bridge to old Makkah Road, Green Line to open from historic Jeddah to Jeddah Station.[40]
- – Train Express Regional Dakar-AIBD to extend to Blaise Diagne International Airport from Diamniadio.[41]
- – Circle MRT line final extension to make closed full loop.[42]
- – Extension of Tamsui–Xinyi line in Taipei to Guangci–Fengtian Temple opens.[43]
- – Wanda–Zhonghe–Shulin line opening.[44]
- – Istanbul-Kapıkule high speed line to start operations.[45]
- – Istanbul Metro M4 to extend to İçmeler from Fevzi Çakmak–Hastane.[46]
- – Istanbul Metro M5 to extend to Sultanbeyli from Samandıra Merkez.[47]
- – Istanbul Metro M7 to extend to Kabataş from Yıldız.[48]
- – Istanbul Metro M11 to extend to Halkalı from Arnavutköy Hastane.[49]
- – Istanbul Metro M12 to start operations between 60. Yıl Parkı and Kâzım Karabekir.[50]
- – Istanbul Metro M14 to start operations between Altunizade and Bosna Bulvarı.[51]
- – Gebze Metro to start operations between Darıca and Gebze.[52]
- – Konya Metro to start operations between Necmettin Erbakan University and Meram Belediyesi.[53]
- – West Midlands Metro Eastside extension is planned to be put into operation, providing connections to Birmingham Airport and High Speed 2.[54]
- – Latest expected date of the Oxford–Bedford railway reopening.[55]
- – Amtrak Gulf Coast to start service between New Orleans and Mobile.[56]
- – Caltrain to extend to Salinas from Gilroy.[57][58][59]
- – DART Silver Line to begin operations between Shiloh Road and DFW Airport Terminal B.[60]
- – Dreamstar Lines to begin service between Los Angeles and San Francisco.[61]
- – Honolulu Skyline to extend to Middle Street from Hālawa.[62]
- – Iowa City Commuter Rail to start operations between Iowa City and North Liberty.[63]
- – KC Streetcar to extend to Berkeley Riverfront from River Market North.[64]
- – Link light rail 2 Line to extend to Redmond from Redmond Technology.[65]
- – Los Angeles Metro C Line to extend from Aviation/Century station to LAX/Metro Transit Center station and K Line to extend from Westchester/Veterans station to Aviation/Century station.[66]
- – Los Angeles Metro D Line to extend to Wilshire/La Cienega from Wilshire/Western.[67]
- – MBTA South Coast Rail to start service from Boston to New Bedford and Fall River.[68]
- – Phoenix Valley Metro Rail South Central Line to open between Central Avenue and Baseline Road.[69]
- – SMART to extend service to Windsor from Sonoma County Airport.[70]
References
edit- ^ Kriikku, Kati (6 August 2023). "Tampereen Ratikan liikennöinti Santalahteen alkaa maanantaina 7. elokuuta – Ratikalla tehty kahdessa vuodessa yli 23 miljoonaa matkaa". Tampereen Ratikka (in Finnish).
- ^ 株式会社インプレス (5 September 2024). "Osaka Metro延伸 コスモスクエア~夢洲が25年1月19日開業". Impress Watch (in Japanese). Retrieved 8 September 2024.
- ^ "Bengaluru Metro's Yellow Line Connecting R.V. Road To Bommasandra Delayed Again; Now Set To Begin In..." Times Now. 8 October 2024. Retrieved 15 October 2024.
- ^ "India Tourism Shines With New Vande Bharat Sleeper Train Set To Link New Delhi With Srinagar: Launch Date And Key Details Inside - Travel And Tour World". 6 October 2024. Retrieved 7 October 2024.
- ^ "Arenaways and Turnit partnership to enhance local rail services in Italy". Global Railway Review. Retrieved 6 October 2024.
- ^ "Every 7 minutes: Tram extension to Findel could open as early as January 2025". RTL Today. 5 January 2024. Retrieved 17 February 2024.
- ^ "Work continues on the Buffalo DL&W Terminal's restoration". 13 April 2023.
- ^ "Major Construction Begins on Foothill Gold Line Extension Project". NBC Los Angeles. 10 July 2020. Retrieved 18 August 2020.
- ^ Felschundneff, Steven (2 February 2023). "State rejects funding light rail extension to Claremont". Claremont Courier. Retrieved 3 February 2023.
- ^ "Foothill Gold Line celebrates completion of major trackwork for Glendora to Pomona light-rail project". Mass Transit. 26 June 2023. Retrieved 29 June 2023.
- ^ a b "Mumbai Metro Aqua Line 3: BKC to Aarey Phase 1 operations set to start from July. Check route map and stations". The Economic Times. 28 May 2024. ISSN 0013-0389. Retrieved 6 October 2024.
- ^ "30% of metro rail priority corridor works completed in Patna". The Times of India. 18 January 2023.
- ^ Stateholders' Workshop for Delhi-Gurgaon-Rewar-Alwar RRTS Corridor (PDF) (Report). Archived from the original (PDF) on 20 September 2017. Retrieved 20 September 2017.
- ^ "Renfe".
- ^ İmamoğlu, Ekrem. "Metro yapımına hız kesmeden devam ediyoruz". Twitter. Retrieved 28 April 2024.
- ^ Mills, Wes (7 July 2023). "Progress continues on Double Track, West Lake Corridor". Lakeshore Public Media. Lakeshore Public Media. Retrieved 27 August 2023.
- ^ "Meerut Metro's first trainset unveiled in major boost to rapid rail project". India Today. 17 February 2024. Retrieved 6 October 2024.
- ^ "Mumbai: Five New Metro Lines To Roll Out Next Year, Details Inside". Lokmat. 4 March 2024. Retrieved 6 October 2024.
- ^ "LRT Shah Alam Line to open in Q3 2024, says Loke".
- ^ "BEM wins bid for Orange Line project". Bangkok Post. 9 September 2022.
- ^ "MRT Orange Line summary of factual information". MRTA Website. 18 March 2023.
- ^ OC Streetcar Project Quarterly Update (Report). 12 October 2023. p. 5. Retrieved 31 October 2023.
- ^ "Automated People Mover Project - Monthly Report for March 2024" (PDF). Electronic Municipal Market Access. LAX Integrated Express Solutions. Retrieved 26 April 2024.
- ^ "Mumbai: Metro Lines 2A & 7 likely to be fully opened on August 15". The Times of India. 4 April 2022. ISSN 0971-8257. Retrieved 6 October 2024.
- ^ Hastie, Hamish (22 May 2023). "Look at the cars: Coldplay concerts delay Armadale line shutdown". WAtoday. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- ^ "Frequently asked questions". Metro Tunnel. Victorian Government. Retrieved 13 June 2020.
- ^ "促进漓江两岸交通融合,桂林轨道交通1号线将规划向东延伸至七星区?-桂林生活网新闻中心". 7 May 2021. Archived from the original on 7 May 2021. Retrieved 6 October 2024.
- ^ 上海未来10年9条轨交新线公示 全线站点解密 ——凤凰房产上海. sh.house.ifeng.com (in Chinese). Archived from the original on 14 September 2017. Retrieved 19 October 2023.
- ^ "Siden blev ikke fundet". Archived from the original on 21 August 2018. Retrieved 21 August 2018.
- ^ "Projet Métro ligne 15 Nouvelle ligne Pont de Sèvres > Noisy-Champs". Île-deFrance Mobilités. 2 August 2023. Retrieved 5 October 2023.
- ^ "Der Bauablauf im Überblick". Linie 1 und 8 (in German). Bremer Straßenbahn AG. Retrieved 21 August 2024.
- ^ "Delhi Metro Phase-4 gets government nod". The Times of India. 6 January 2017. Archived from the original on 9 July 2017. Retrieved 19 October 2023.
- ^ "Will not let funding row derail Phase-IV: Government". The Economic Times. 4 July 2017. Archived from the original on 7 July 2017. Retrieved 19 October 2023.
- ^ "MMRDA to begin tree count for Metro 6". Mid-day. 6 April 2017. Retrieved 6 October 2024.
- ^ "Bidding for Metro 10 line to start later this year". DNA India. Retrieved 6 October 2024.
- ^ Jones, Ben (4 January 2024). "The most exciting new trains coming in 2024". CNN. Retrieved 18 October 2024.
- ^ "Este sería el recorrido de la Línea 5 del Tren Ligero en Guadalajara (MAPA)". El Informador :: Noticias de Jalisco, México, Deportes & Entretenimiento (in Mexican Spanish). 21 August 2024. Retrieved 8 September 2024.
Se tiene previsto que la L4 del Tren Ligero arranque hasta el primer semestre del 2025.
- ^ "Corredor Interoceánico: este es el avance de la Línea K; tramo entre Oaxaca y Chiapas". Diario del Istmo (in Mexican Spanish). 3 September 2024. Retrieved 8 September 2024.
- ^ "Auckland's City Rail Link cost climbs by $1 billion". RNZ. 15 March 2023. Archived from the original on 17 May 2023. Retrieved 17 May 2023.
- ^ Writer, Staff; ZAWYA. "Saudi to issue Jeddah Metro tenders to private sector". www.zawya.com. Retrieved 6 October 2024.
- ^ "CAF delivers first out of 7 new trains to Senegal". RAILMARKET.com. Retrieved 16 October 2024.
- ^ "Three new stations to close loop on Circle Line". TODAY. Retrieved 22 August 2024.
- ^ Liu Yanyi (劉彥宜) (9 December 2023). "史上最困難捷運工程!信義線東延段力拚2025年底前完工 | 政治 | CTWANT". www.ctwant.com (in Chinese). CTWant. Retrieved 9 December 2023.
- ^ Gerber, Abraham (9 November 2014). "MRT line to take 8 years: DORTS". Taipei Times. Retrieved 19 October 2014.
- ^ "Halkalı-Kapıkule Hızlı Tren Projesi'nin ilk etabı 2025'te tamamlanacak". www.aa.com.tr. Retrieved 6 October 2024.
- ^ "Istanbul: Metro reaches the Asian airport". Urban Transport Magazine. 3 October 2022. Retrieved 6 October 2024.
- ^ "Uskudar-Samandira Metro Line". www.metro.istanbul. Retrieved 6 October 2024.
- ^ "300 Gün 300 Proje". 300gun300proje.ibb.istanbul. Retrieved 6 October 2024.
- ^ "Bakan Uraloğlu tarih verdi: Gayrettepe-Halkalı arası 57 dakikaya düşüyor!". Milliyet (in Turkish). 29 September 2024. Retrieved 6 October 2024.
- ^ "Facebook". www.facebook.com. Retrieved 6 October 2024.
- ^ #Canlı | A Haber ekranlarında Canan Barlas ile Gündem Programı'nın konuğuyum. Retrieved 6 October 2024 – via www.youtube.com.
- ^ Ajansı, Anadolu (28 September 2023). "Zinnur Büyükgöz, Gebze Halkına Müjdeyi Verdi!". Mavi Marmara Gazetesi (in Turkish). Retrieved 6 October 2024.
- ^ International2019-11-14T14:36:00+00:00, Metro Report. "Sino-Turkish consortium to build Konya metro". Railway Gazette International. Retrieved 6 October 2024.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ Jones, Tamlyn (25 May 2021). "Work to start on next phase of West Midlands Metro extension". Business Live. Retrieved 28 May 2021.
- ^ Cuzner, Mark, ed. (May 2022). "EWR2 Project Newsletter – Spring 2022". East West Rail Alliance. (Winslow Station progress update)
- ^ Herald, Sun (6 August 2024). "Amtrak train from NOLA to Mobile finally gets approved. What's next and when will it roll?". NOLA.com. Retrieved 12 August 2024.
- ^ "MONTEREY COUNTY RAIL EXTENSION" (PDF). Transportation Agency for Monterey County. Archived (PDF) from the original on 2 September 2023. Retrieved 6 September 2024.
- ^ Schmalz, David (12 October 2021). "A long-stalled commuter rail extension project from Gilroy to Salinas is making critical progress, and finally has an estimated arrival time". Monterey County Weekly. Retrieved 12 October 2021.
- ^ "Heart of Salinas gets a new life". Monterey Herald. 15 October 2022. Retrieved 6 September 2024.
- ^ "Silver Line Project". dart.org. Retrieved 22 June 2023.
- ^ Worrell, Carolina (27 March 2024). "Report: Dreamstar Lines Signs MOU With UP for Coast Line Track Access". Railway Age. Retrieved 31 March 2024.
- ^ "'A 21st-century system': To fanfare, city announces official opening date of rail's first phase". Hawaii News Now. 9 May 2023. Retrieved 19 June 2023.
- ^ Hansen, Ryan. "Battery-operated passenger train from Iowa City to North Liberty possible as soon as 2025". USA TODAY. Retrieved 22 August 2024.
- ^ "Project Overview". Build KC Streetcar. Retrieved 15 October 2024.
- ^ "Downtown Redmond Link Extension | Project map and summary | Sound Transit". www.soundtransit.org. Retrieved 22 August 2024.
- ^ "🚨 Two big changes are coming soon to the C and K Lines Nov. 3". Instagram. Los Angeles County Metropolitan Transportation Authority. Retrieved 22 October 2024.
- ^ @numble. "October 2023 status report for LA Metro's D Line Extension Section 1. 88.66% as of 10/27/23, +0.6% since 9/29/23. Contractor's forecast completion date is 6/17/23, 25 days later than last forecast". Retrieved 18 December 2023.
- ^ Farrar, Molly (16 June 2024). "South Coast commuter rail extension start delayed again to spring 2025". Boston.com. Archived from the original on 17 June 2024. Retrieved 17 June 2024.
- ^ "South Central Extension/Downtown Hub". Valley Metro. 22 November 2019. Retrieved 28 February 2020.
- ^ "SMART restarts work on long-awaited Windsor extension". Marin Independent Journal. 24 November 2023. Retrieved 6 September 2024.