Submission declined on 2 January 2023 by CNMall41 (talk).
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
|
Submission declined on 12 June 2022 by DoubleGrazing (talk). This draft's references do not show that the subject qualifies for a Wikipedia article. In summary, the draft needs multiple published sources that are: Declined by DoubleGrazing 2 years ago.
|
- Comment: References must meet WP:ORGCRIT. I realize that it was shut down in 1994 so press after that time period may be limited; however, everything I can find that would be significant is local and does not rise to the standards for WP:NCORP. CNMall41 (talk) 10:39, 2 January 2023 (UTC)
- Comment: Only primary sources cited. Notability per WP:GNG requires significant coverage in multiple independent and reliable secondary sources. DoubleGrazing (talk) 09:07, 12 June 2022 (UTC)
Circle Smelting Corp | |
---|---|
Superfund site | |
Geography | |
Town | Beckemeyer |
County | Clinton County |
State | Illinois |
Coordinates | 38°36′29″N 89°25′13″W / 38.6081°N 89.4203°W |
Information | |
CERCLIS ID | ILD050231976 |
Contaminants | Mainly Lead |
Responsible parties | Asarco |
Progress | |
Proposed | 17 June 1996[1] |
List of Superfund sites |
Circle Smelting Corp was a company owned by Asarco that operated out of Beckemeyer, Illinois from 1904 to 1994 before it was shut down by the United States Environmental Protection Agency in October 1994 and declared a superfund site in 1996.[2]
Operational history
editCircle Smelting Corp was built in 1904, in the town of Beckemeyer, Illinois along the Ohio & Mississippi line of the Baltimore and Ohio Railroad. The facility began operation in 1904 when its primary zinc smelting plant was built. In 1920 a secondary zinc smelting facility was built with about 20 people working. In 1930, the facility was acquired by Federated Metals, a subsidiary of ASARCO.[3] By 1937 it had a production capacity of 15,000 tons and mainly made Spelter.[4] The facility didn't just smelt zinc however many other metals were smelted including aluminum, lead, zinc, zinc oxides, magnesium oxide, copper oxide, borates, and iron. The plant produced zinc metal, zinc compounds, fertilizer additives, and animal feed additives.[2][5][6]
Waste the facility produced including coal and coke cinders were deposited on-site or used around Beckemeyer as backfill. This led to large ground contamination in and around the area of Circle Smelting. In July 1986 a fire broke out at the Circle Smelting Corp facility, the fire burned for over five hours and destroyed the central building of the smelter, the fire required the combined help of four neighboring fire departments to put out. Due to the potential of contamination from the facility Deputy Joe Muehlhausen alerted the EPA in Springfield. The EPA ordered the evacuation of downwind homes due to the possibility of wind bourn contaminants and as a result, four homes were evacuated.[7] After the fire, the EPA conducted an inspection in the fall of 1994. The EPA declared Circle Smelting Corp a superfund site in 1996.[2][5][6]
Inspection
editAfter the fire in 1986, EPA inspectors arrived at the facility and set up an air monitoring station for particulate emissions. In 1988 inspectors tested on-site contaminates in the soil and wastes produced by the facility. In February and March 1992, an expanded inspection was completed and as a result of this inspection in April 1993 the Illinois Department of Public Health(IDHP) ordered blood testing from the surrounding population. The tests were held at the Beckemeyer grade school, and 248 willing participants were tested for lead concentration, however, the tests which were conducted in the fall of that year did not show any danger to public health from lead contamination.[2][5][6][8] In May 1993, the EPA conducted a week-long study of the site and found that some areas had 1,000-30,0000 parts per million with the safe concentration being 500 PPM. This study caused the suspension of a local water project.[9]
The EPA nominated the site for superfund status in 1996. Off-site soil sampling began in April 1999 and went on until the spring of 2000, it revealed that contamination had spread into the surrounding wetlands from decades of runoff. The highest concentration sampled was 65,930 mg/kg with the natural concentration of lead in the area being around 7-20 mg/kg.[2][5][6][10]
Cleanup
editIn June 1999 Circle Smelting Corp was demolished. The site's clean-up began in 2001 with contractors removing about 35,000 cubic yards of contaminated soil from 300 properties in the town and depositing it in a mound where the former facility used to lay. In 2002 the EPA took over the clean-up operations from the contractors. The EPA erected a fence around the former facility and built settling ponds to clean out contaminated groundwater.[2][5][6] By a 2006 lead contamination study performed by the Environmental Working Group on the water supply of Beckemeyer found that the lead contamination was at 1.82 PPB, which is still elevated from the recommended health limit of 0.20 PPB, but below the legal limit of 15 PPB.[11]
On 9 August 2005, ASARCO filed for bankruptcy, in the settlement made on 13 March 2009, ASARCO settled with the EPA to pay 1.79 billion for the environmental cleanup of their facilities, including Circle Smelting Corp.[12] The clean up for circle smelting amounted to $6,052,390 with $200,000 available for future clean-up.[13]
References
edit- ^ "Proposed National Priorities List (NPL) Sites - by State". United States Environmental Protection Agency. 8 June 2015. Retrieved 19 February 2022.
- ^ a b c d e f "Public Health Assessment Circle Smelting Corporation Beckemeyer, Clinton County, Illinois EPA Facility ID# ILD050231976" (PDF). Illinois Department of Public Health. Retrieved 19 February 2022.
- ^ "in re asarco incorporated and federated metals corporation". EPA. Retrieved 28 April 2023.
- ^ "Drifts and Crosscuts". Vol. 31, no. 2. THE MINING JOURNAL. 30 May 1937.
- ^ a b c d e "CIRCLE SMELTING CORP. BECKEMEYER, IL". United States Environmental Protection Agency. Retrieved 19 February 2022.
- ^ a b c d e "CIRCLE SMELTING CORP Beckemeyer, Illinois". canvas of ruin. Retrieved 19 February 2022.
- ^ "Beckemeyer Smelter damaged by fire Sun". the Breese journal. 24 July 1986. Retrieved 20 October 2022.
- ^ "Water Project on Hold while EPA takes samples". The Breese Journal. 7 October 1993. Retrieved 21 October 2022.
- ^ "Health Hazards halt water project". The Breese Journal. 1 July 1993. Retrieved 21 October 2022.
- ^ "NPL Site Narrative for Circle Smelting Corp" (PDF). United States Environmental Protection Agency. Retrieved 20 February 2022.
- ^ "Toxic waters". New York times. 16 May 2012. Retrieved 26 April 2023.
- ^ "Feds Get $1.79 B from ASARCO to Clean Up Mining Sites". Enviromental Protection. 11 December 2009. Retrieved 28 April 2023.
- ^ "Case Summary: EPA Funded Sites and Communities in the ASARCO Bankruptcy Settlement". EPA. 9 May 2013. Retrieved 28 April 2023.
Category:Superfund sites in Illinois Category:Buildings and structures in Clinton County, Illinois
- in-depth (not just brief mentions about the subject or routine announcements)
- reliable
- secondary
- strictly independent of the subject
Make sure you add references that meet all four of these criteria before resubmitting. Learn about mistakes to avoid when addressing this issue. If no additional references exist, the subject is not suitable for Wikipedia.