Line 10 of the Shenyang Metro (Chinese: 沈阳地铁10号线; pinyin: Shěnyáng Dìtiě Shí Hào Xiàn) is a rapid transit line running from northwest to southwest Shenyang in "コ" shape. The line opened on 29 April 2020.[1]
Line 10 | |
---|---|
Overview | |
Status | Operational |
Owner | Shenyang |
Locale | Shenyang, Liaoning, China, Asia |
Termini | |
Stations | 21 |
Service | |
Type | Rapid transit |
System | Shenyang Metro |
Services | 1 |
Operator(s) | Shenyang Metro Corporation |
History | |
Opened | 29 April 2020[1] |
Technical | |
Line length | 27.21 km (16.91 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The line is 27.21 km long with 21 stations. Line 10, together with Line 9 will form a loop around Shenyang.
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dingxianghu — Zhangshabu | 29 April 2020[1] | 27.21 km (16.91 mi) | 21 | Phase 1 |
Stations
editStation name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
Pinyin | Chinese | |||||
Dingxianghu | 丁香湖 | Yuhong | ||||
Yuanjiangjie | 元江街 | |||||
Xianggongjie | 向工街 | |||||
Tawanjie | 塔湾街 | Huanggu | ||||
Huaihejieshenyieryuan | 淮河街沈医二院 | 9 | ||||
Bainiaogongyuan | 百鸟公园 | |||||
Changjiangjie | 长江街 | |||||
Zhongyiyaodaxue | 中医药大学 | 2 | ||||
Lingdongjie | 陵东街 | Dadong | ||||
Beita | 北塔 | |||||
Hezuojie | 合作街 | 4 | ||||
Dongbeidamalu | 东北大马路 | |||||
Pangjiangjie | 滂江街 | 1 | ||||
Chang'anlu | 长安路 | |||||
Wanlian | 万莲 | |||||
Quanyuan | 泉园 | Shenhe | ||||
Jiangdongjie | 江东街 | |||||
Changqingqiao | 长青桥 | |||||
Changqingnanjie | 长青南街 | 9 Shenyang Modern Tram | Hunnan | |||
Ligongdaxue | 理工大学 | |||||
Zhangshabu | 张沙布 | |||||
References
edit