Line 1 (Shenyang Metro)

Line 1 of the Shenyang Metro (Chinese: 沈阳地铁一号线; pinyin: Shěnyáng Dìtiě Yī Hào Xiàn) is a rapid transit line running from west to east Shenyang. It was opened on 27 September 2010. This line is 27.80 km long with 22 stations.[1]

Line 1
Shenyangzhan station
Overview
StatusOperational
OwnerShenyang
LocaleShenyang, Liaoning, China, Asia
Termini
Stations22
Service
TypeRapid transit
SystemShenyang Metro
Services1
Operator(s)Shenyang Metro Corporation
History
Opened27 September 2010; 14 years ago (2010-09-27)
Technical
Line length27.80 km (17.27 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Shisanhaojie Depot
Shisanhaojie
Zhongyangdajie
Qihaojie
Sihaojie
Chuangmou River
Zhangshi
Freight Railway
Kaifadadao
Yuhongguangchang
Yingbinlu
Shenshan Railway
Zhonggongjie
Qigongjie
Weigong canal
Baogongjie
Tiexiguangchang Line 9
Yunfengbeijie
Shenyang railway station
Shenyangzhan
Taiyuanjie
Line 4
Nanshichang
Lines 1 and 2 connection
Qingniandajie
Huaiyuanmen
Zhongjie
Dongzhongjie
Pangjiangjie
Limingguangchang

Opening timeline

edit
Segment Commencement Length Station(s) Name
Shisanhaojie — Limingguangchang 27 September 2010 27.8 km (17.27 mi) 22 Phase 1

Stations (west to east)

edit
station name Transfer Distance
km
Location
Pinyin Chinese
Shisanhaojie 十三号街 0.00 0.00 Tiexi
Zhongyangdajie 中央大街 1.00 1.00
Qihaojie 七号街 1.40 2.40
Sihaojie 四号街 1.50 3.90
Zhangshi 张士 1.55 5.45
Kaifadadao 开发大道 1.40 6.85
Yuhongguangchang 于洪广场 1.50 8.35 Yuhong
Yingbinlu 迎宾路 1.00 9.35
Zhonggongjie 重工街 1.95 11.30 Tiexi
Qigongjie 启工街 1.05 12.35
Baogongjie 保工街 1.00 13.35
Tiexiguangchang 铁西广场  9  1.40 14.75
Yunfengbeijie 云峰北街 1.15 15.90
Shenyangzhan 沈阳站   SYT 1.60 17.50 Heping
Taiyuanjie 太原街  4  0.95 18.45
Nanshichang 南市场 1.20 19.65
Qingniandajie 青年大街  2  1.10 20.75 Shenhe
Huaiyuanmen 怀远门 1.30 22.05
Zhongjie 中街 1.35 23.40
Dongzhongjie 东中街 0.75 24.15 Dadong
Pangjiangjie 滂江街  10  1.65 25.80
Limingguangchang 黎明广场 1.30 27.10

Rolling stock

edit
Type Time of manufacturing Series Sets Assembly Notes
Type B 2008 - 2010 DKZ17 23 Tc+Mp+M+T+Mp+Tc Manufactured by Changchun Railway Vehicles[2]

Future

edit

An eastern extension is planned with ten stations and a length of 16.15 kilometres (10.04 mi). Construction started on 26 December 2020.[3]

References

edit
  1. ^ "沈阳地铁1号线车站站名"出炉"" (in Chinese). 沈阳地铁官方网站. Archived from the original on 28 February 2014. Retrieved 4 October 2012.
  2. ^ "系统异常". chinacnr.com (in Chinese). Archived from the original on 13 December 2014. Retrieved 30 April 2015.
  3. ^ "『沈阳』地铁6号线、1号线东延线开工". www.rail-transit.com. Retrieved 2021-01-10.