Luchterduinen is an offshore wind farm in the North Sea, 23 kilometres off the coast near Noordwijk aan Zee. The farm was developed by Eneco and has been fully operational since September 2015.[1]
Luchterduinen | |
---|---|
Country |
|
Coordinates | 52°25′N 4°10′E / 52.42°N 4.17°E |
Status | Operational |
Commission date |
|
Wind farm | |
Type | |
Rotor diameter |
|
Power generation | |
Units operational | 43 × 3 MW |
Make and model | Vestas V112-3.0MW (43) |
Nameplate capacity |
|
External links | |
Commons | Related media on Commons |
The wind farm had the working name Q10. A vote was held for a new name. On 15 May 2012, the name Luchterduinen was chosen from 150 submissions, referring to the dunes between Noordwijk and Zandvoort where a building called Huis ter Lucht used to stand.[2]
The farm consists of 43 Vestas V112 (3 MW) wind turbines with a total capacity of 129 MW. The farm covers an area of approximately 16 square kilometres.[3] it is encompassed by the Hollandse Kust Zuid offshore wind farm on the northwest, southwest and southeast.
See also
editReferences
edit- ^ "Opening derde windpark op zee". nos.nl (in Dutch). 2015-09-21. Retrieved 2023-04-03.
- ^ "Windmolenpark Q10 bij Zandvoort wordt 'Luchterduinen'". Haarlems Dagblad (in Dutch). 15 May 2012. Retrieved 2023-04-03.
- ^ "Eneco Luchterduinen Wind Farm". www.eneco.com. Retrieved 2023-04-03.