Manjunatha Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the city of Nelamangala in Karnataka.
As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024 and with successful trial run, this metro station is slated to be operational around end of September 2024 or beginning of October 2024.[1][2]
Station layout
editStation Layout (TBC)
Manjunath Nagar track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Silk Institute Next Station: Nagasandra | |
Platform 1 Northbound |
Towards ← Madavara Next Station: Chikkabidarakallu | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exits
editThis section is empty. You can help by adding to it. (August 2024) |
See also
editReferences
edit- ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
- ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
External links
editWikimedia Commons has media related to Namma Metro.
Wikivoyage has a travel guide for Bangalore.
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.