This page summarizes projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2016. This is part of the Wikipedia summary of Oil Megaprojects.
Quick links to other years
editOverview | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 |
Detailed list of projects for 2016
editTerminology
- Year Startup: year of first oil. put specific date if available.
- Operator: company undertaking the project.
- Area: onshore (LAND), offshore (OFF), offshore deep water (ODW), tar sands (TAR).
- Type: liquid category (i.e. Natural Gas Liquids, Natural gas condensate, Crude oil)
- Grade: oil quality (light, medium, heavy, sour) or API gravity
- 2P resvs: 2P (proven + probable) oil reserves in giga barrels (Gb).
- GOR: The ratio of produced gas to produced oil, commonly abbreviated GOR.[1]
- Peak year: year of the production plateau/peak.
- Peak: maximum production expected (thousand barrels/day).
- Discovery: year of discovery.
- Capital investment: expected capital cost; FID (Final Investment Decision) - If no FID, then normally no project development contracts can be awarded. For many projects, a FEED stage (Front End Engineering Design) precedes the FID.
- Notes: comments about the project (footnotes).
- Ref: list of sources.
Country | Project Name | Year startup | Operator | Area | Type | Grade | 2P resvs | GOR | Peak Year | Peak | Discovery | Capital Inv. | Notes | Ref |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
OPEC | ||||||||||||||
Angola | Kizomba Satellites Phase II | 2016 | ExxonMobil | ODW | Crude | 125 | [2] | |||||||
Angola | Negage | 2016 | Chevron | ODW | Crude | 75 | [2] | |||||||
Angola | Lucapa | 2016 | Chevron | ODW | Crude | 100 | [2] | |||||||
Angola | East Hub project (Cabaca Norte, South-East) | 2016 | Eni | ODW | Crude | 80 | [2] | |||||||
Angola | B31 SE | 2016 | BP | ODW | Crude | 200 | [2] | |||||||
Iran | Azadegan Ph 1 | 2016 | CNPC | Land | Crude | 75 | [3] | |||||||
Iran | South Pars Ph 11 | 2016 | CNPC | Offshore | Crude | 80 | [3] | |||||||
Iran | South Pars Ph 17-18 | 2016 | PetroPars, OIEC, IOEC | Offshore | Crude | 80 | [3] | |||||||
Iran | South Pars Ph 22-23-24 | 2016 | Petro Sina Arian, Sadra | Offshore | Crude | 77 | [3] | |||||||
Iran | Yadavaran Ph 1 | 2016 | Sinopec | LAND | Crude | Heavy | 3.20 | 85 | 2000 | [4] | ||||
Nigeria | Bonga SW; Aparo | 2016 | Shell | Crude | Light | 0.600 | 225 | 1998/2001 | [5] | |||||
Nigeria | Dibi Long-Term Project | 2016 | Chevron | Crude | 70 | [5] | ||||||||
Nigeria | Sonam Field Development | 2016 | Chevron | Crude | 30 | [5] | ||||||||
Nigeria | Bosi | 2016 | ExxonMobil | Crude | 140 | [5] | ||||||||
Nigeria | Erha North Phase 2 | 2016 | ExxonMobil | Crude | 60 | [5] | ||||||||
Nigeria | Satellite Field Development Phase 2 | 2016 | ExxonMobil | Crude | 80 | [5] | ||||||||
Nigeria | Uge | 2016 | ExxonMobil | Crude | 110 | [5] | ||||||||
Nigeria | Bongo North | 2016 | Shell | Crude | 100 | [5] | ||||||||
Nigeria | Usan Future Phases | 2016 | Total | Crude | 50 | [5] | ||||||||
Saudi Arabia | Manifa Ph 2 | 2016 | Saudi Aramco | OFF | Crude | 28 API | 16.820 | 300 | 1957 | [6][7][8][9] | ||||
Non-OPEC | ||||||||||||||
Canada | Hebron (Ben Nevis) | 2016 | ExxonMobil | OFF | Crude | Heavy | 0.730 | 140 | 1981 | [10][11][12] | ||||
Canada | Sunrise Ph 3 | 2016 | Husky Energy | Oil Sands | Bitumen | 1.0-2.2 | 0 | No FID, 50 kbd | SAGD | [13][14][15] | ||||
Canada | NAOSC Strathcona Ph 1 | 2016 | StatoilHydro | LAND | Bitumen | Oil Sands | 65 | [16][17] | ||||||
Canada | Gregoire Lake (Phase 1) | 2016 | CNRL | LAND | Bitumen | Oil Sands | 30 | In-Situ, Announced | [18] | |||||
Canada | Joslyn Ph 2 | 2016 | CNRL | LAND | Bitumen | Oil Sands | 0 | Application No FID 50 kbd | [16] | |||||
Canada | Long Lake Upgrader Ph 3 | 2016 | OPTI /Nexen | LAND | Bitumen | Oil Sands | 0 | Mining, Upgrading, No FID, 60 kbd | [19] | |||||
Kazakhstan | Kashagan (Phase 2+, Satellites) | 2016 | ENI | OFF | Crude | 45 API | 7.8 | 2020 | 850 | 2000 | $136B, No FID | [20][21][22][23] | ||
Malaysia | Malikai | 2016 | Shell | ODW | Crude | 150 | 2004 | [24] | ||||||
United Kingdom Falkland Islands | Sea Lion | 2016 | Rockhopper | OFF | Crude | .3556 | 2016 | 70 | [25] |
References
edit- ^ "Oilfield Glossary".
- ^ a b c d e "EIA Algeria overview".
- ^ a b c d "EIA Iran overview".
- ^ "EIA Iran Country Analysis".
- ^ a b c d e f g h i "EIA Nigeria Analysis".
- ^ "Projects Timeline, Facts and Figures - 2006, Saudi Aramco" (PDF).
- ^ "Relationship between Giant Field Data and Ultimate Recoverable Oil, Search and Discovery Article #40236, May 12, 2007".
- ^ "UPDATE 1-Saudi 2009 oil capacity plan on track-official, Reuters UK, January 6, 2008".[dead link ]
- ^ "Saudi Oil: A Crude Awakening on Supply?, BusinessWeek, July 10, 2008". Archived from the original on July 13, 2008.
- ^ "Newfoundland sees new oil era as Hebron proceeds, Reuters, August 20, 2008". August 20, 2008.
- ^ "Upstream and Gas, Chevron, March 26, 2008" (PDF).
- ^ "Value capture and growth, StatoilHydro, May 2008" (PDF). Archived from the original (PDF) on December 6, 2008.
- ^ "Oil Sands". Husky Energy. Archived from the original on 2007-10-30. Retrieved 2007-11-25.
- ^ Oil Sands Fact Sheet, Husky Energy, retrieved 2007-11-25
- ^ "Canadian Oil Sands Projects - Jan 2008". Archived from the original on 2008-12-18. Retrieved 2017-09-10.
- ^ a b Canadian Oil Sands Projects - Jan 2008, archived from the original on 2008-12-18, retrieved 2017-09-10
- ^ StatoilHydro upgrader delayed, Financial Post, May 23, 2008, archived from the original on May 27, 2008, retrieved May 29, 2008
- ^ Canada's Oil Sands - Opportunities and Challenges to 2015: An Update (PDF), NEB
- ^ "Existing and Proposed Canadian Commercial Oil Sands Projects, Strategy West, April 2008" (PDF).
- ^ "UPDATE 3-Eni-led group close to giving KMG more of Kashagan, Reuters UK, December 2, 2007".[dead link ]
- ^ "2008 Analyst Meeting, ConocoPhillips, March 12, 2008" (PDF). Archived from the original (PDF) on December 6, 2008. Retrieved May 11, 2008.
- ^ "Kashagan development postponed until 2013, The European Weekly, June 23, 2008". Archived from the original on June 26, 2008. Retrieved June 25, 2008.
- ^ "MATERIAL DEVELOPMENTS RELATING TO THE KASHAGAN FIELD DEVELOPMENT PROJECT, ENI, viewed September 5, 2008" (PDF).
- ^ "Malikai Field, February 2011".
- ^ "Rockhopper revised CPR and corporate update, April 2012".