The Outer Ring Road, officially State Highway 234 (SH 234),[1] is a major transport corridor along the periphery of Chennai Metropolitan Area (CMA) by the Chennai Metropolitan Development Authority (CMDA). It is 62 km long road connecting GST Road at Perungalathur, GST Road at Vandalur, NH 48 (GWT Road) at Nazarethpettai, NH 716 (CTH Road) at Nemilichery to NH 16 (GNT Road) at Vijayanaallur and to TPP road at Minjur. On 29 August 2010, the then Tamil Nadu Deputy Chief Minister M. K. Stalin laid the foundation for the first phase of the project from Vandalur to Nemilichery covering a distance of 30 kilometres (19 mi). The Chennai ORR generally covers Avadi, Redhills, Minjur and Tambaram neighbourhoods. Chennai Outer ring road had a plan of Chennai metro rail CMRL which is going to build up at gap between two roads.
Outer Ring Road, Chennai | |
---|---|
Route information | |
Maintained by Tamil Nadu Road Development Company (TNRDC) | |
Location | |
Country | India |
Highway system | |
Phases
editThe project was developed in 2 phases with 2 segments each.
Phase 1
editThe Phase 1 of the project covers a distance of 29.65 km. 10 Grade separators at major junctions have been planned along this route. It also includes 50 bus bays on both sides and also truck lay-byes for parking of around 100 trucks. Phase I of this project was implemented by GMR, and the project was originally expected to be completed by June 2012. Phase I was thrown open to the public on 29 August 2014 the then Chief Minister of Tamil Nadu J. Jayalalithaa through Video conferencing.
Segment I
editThe Segment I extends from GST Road (Vandalur) to NH48 (Nazarethpettai) covering a distance of 19.7 km. The development covers an area of about 265.38 Hectares.
Segment II
editThe Segment II extends from NH48 (Nazarethpettai) to CTH Road (Nemilichery) covering a distance of 9.5 km. The development covers an area of about 140.9 Hectares.
Phase II
editThe Phase 2 covers a distance of 33.1 km.
Segment III
editThe Segment III extends from CTH Road (Nemilichery) to GNT Road (Redhills) covering a distance of 18.8 km. The development covers an area of about 258.02 Hectares.
Planned Developments (PPP mode)
editPrice Waterhouse Coopers (PWC) has done a micro market study on the development of 50 m along the road. It has suggested that the components of the development could include a 5-star hotel, retail segments – including an "auto main street" where the ORR connects industrial suburbs that house automobile giants such as Hyundai, Ford and Renault Nissan – and facilities like multiplex, residential, hospital, commercial, warehouse and green spaces. Developers would be identified through open competitive bidding for these projects.[2]
High-Growth Zone
editThe region close to NH-45 is seen as a high-growth area covering the Chennai neighbourhoods places Vandalur, Mannivakkam, Mudichur, Redhills, Thiruninravur, Pattabiram, Muthapudupet, Morai, Malayambakkam-Mangadu, Minjur and Ponneri (Smart City). This would be the location for a 5-star hotel.
Auto Main Street
editLocalities near Minjur and Ponneri, which are hubs of automobile and component industries, would be the ideal locale for the auto main street, which is a niche retail for the automobile industry for which about 50 acres (200,000 m2) have been earmarked.
Residential Areas
editResidential areas have been planned for more than 150 acres near Minjur, Ponneri while residential spaces have been planned at Malayambakkam, Nazarethpettai, Agaramel and Poonamallee.
Warehouse
editA major warehouse has been planned in Minjur.
IT Park
editPattabiram in Avadi would have TIDEL IT Park.
Project Status
editJune 2015:
- GMR — NAPC has been awarded the contract for development of Phase I of ORR. First phase is to cost about 1,100 crores.[3][4]
- Project will be completed by November 2020
February 2021:
- Road has been opened completely for public use on 8th Feb 2021.[5]
References
edit- ^ Ramakrishnan, Deepa H. (11 November 2018). "Chennai Outer Ring Road will now be known as SH 234". The Hindu. Chennai: Kasturi & Sons. Retrieved 18 November 2018.
- ^ "A road to ring in growth". Archived from the original on 12 August 2009. Retrieved 24 August 2009.
- ^ [1] Archived 17 September 2009 at the Wayback Machine
- ^ Highways - Chennai Outer Ring Road Archived 13 April 2010 at the Wayback Machine. Gmrgroup.co.in. Retrieved on 2013-12-06.
- ^ Sundaram, Ram (8 February 2021). "CM opens second phase of Chennai Outer Ring Road". The Times of India. Chennai: The Times Group. Retrieved 9 February 2021.