State Highway 9 (West Bengal) is a state highway in West Bengal, India.
State Highway 9 | |
---|---|
Durgapur Bankura road (partially) | |
Route information | |
Maintained by PWD West Bengal | |
Length | 251 km (156 mi) |
Major junctions | |
North end | Durgapur |
NH 19 From Muchipara,Durgapur
SH 8 from Beliatore to Bankura NH 14 from Bikna to Dhaldanga SH 4 from Raipur Bazar to Pirolgari morh SH 2 at Baralaksmanpur SH 5 from Silda to Narayanpur NH 49 from Chichra to Fekohaat | |
South end | Nayagram |
Location | |
Country | India |
State | West Bengal |
Districts | Paschim Bardhaman, Bankura, Jhargram |
Highway system | |
State Highways in West Bengal |
Route
editSH 9 originates from Durgapur and passes through Barjora, Beliatore, Bikna, Bankura, Taldangra, Simlapal, Raipur Bazar, Matgoda, Phulkusma, Silda, Gidhni, Chilkigarh, Gopiballavpur, Chhatinasol and terminates at Nayagram.[1]
The total length of SH 9 is 251 km.[2]
Districts traversed by SH 9 are:[3]
Paschim Bardhaman district (0 – 7 km)
Bankura district (7 – 89 km)
Jhargram district (89 – 251 km)
Major Locations on State Highway
editPaschim Bardhaman:-
editBankura :-
editJhargram:-
edit- Benagaria
- Dharsa
- Fekohaat
- Nayangram
Toll Plazas
editThe only toll plaza is in Pratappur on the Bankura bank of Damodar just after the Durgapur Barrage and is named as Durgapur Toll Plaza. The toll plaza is 6 laned and is yet to start post the expansion of the Durgapur part of the Highway to 4 lane highway.
Future Plans
editThe section of the highway from Muchipara to Durgapur barrage is being 4 laned as per the decisions taken by the West Bengal Government in 2017. Under this project, several new bridges are being constructed. The rail over bridge was also made operational for about a year now. A whole new 4 Laned wide bridge is planned as a substitute for the shaky Durgapur Barrage which was not repaired even once since its construction in 1950. The barrage has developed cracks and is hazardous now. Owing to these reasons a whole new bridge is under construction and hopefully will be complete in 3 years. The work of four landing is at its peak. The entire road would be wide 4 laned with street light mounted dividers with a railing. The road would also possess a footpath along its entire length. There would be bus stops on sides and traffic signals to control the heavy traffic of the Durgapur flank of this road.[citation needed]
Road sections
editIt is divided into different sections as follows:.[2][4][5][6]
Road Section | District | CD Block | Length (km) |
---|---|---|---|
Muchipara NH 19-Durgapur Barrage | Paschim Bardhaman | - | 7 |
Durgapur Barrage-Bankura | Bankura | Barjora, Bankura II | 42 |
Bankura-Taldangra-Simlapal | Bankura | Bankura I, Onda, Taldangra, Simlapal | 40 |
Simlapal-Krishnapur-Raipur-Fulkusma-Benagaria | Bankura, Jhargram | Sarenga, Raipur | 37 |
Benagaria-Silda | Jhargram | Binpur II | 8 |
Silda-Narayanpur (common route with SH 5 | Jhargram | Binpur II | |
Narayanpur-Dharsa-Fekohaat | Jhargram | Jamboni | 34 |
Fekohaat-Nayagram | Jhargram | Gopiballavpur I, Gopiballavpur II, Nayagram | 54 |
See also
editReferences
edit- ^ Google maps
- ^ a b "List of State Highways in West Bengal". West Bengal Traffic Police. Retrieved 31 August 2016.
- ^ "Road - Highway". Public Works Department, Government of West Bengal. Retrieved 30 November 2016.
- ^ "Bardhaman Tehsil/ CD Block Map". Maps of India. Retrieved 31 August 2016.
- ^ "Bankura Tehsil/ CD Block Map". Maps of India. Retrieved 31 August 2016.
- ^ "Paschim Medinipur Tehsil/ CD Block". Maps of India. Retrieved 31 August 2016.