Talk:Cross Island MRT line

Latest comment: 11 months ago by 138.75.104.214 in topic Rolling Stock article
edit

Hello fellow Wikipedians,

I have just modified 6 external links on Cross Island MRT Line. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 21:02, 14 August 2017 (UTC)Reply

Please change the line colour.

edit

Apparently it's lime green, according to the CRL map released today. Allkayloh (talk) 04:57, 25 January 2019 (UTC)Reply

Treat Punggol extension as separate branch line in 'Stations' maybe?

edit

The Punggol extension uses the line code "CP" instead of "CR" used for the rest of the line. So I thought that it may be a good idea to treat it as a separate branch line in the "Stations" subsection of the article. However, it may or may not be the correct thing to do, which is why I left it in the talk page. VoicefulBread66 (talk) 13:56, 10 March 2020 (UTC)Reply

By the way, I am talking about the first infographic. VoicefulBread66 (talk) 14:02, 10 March 2020 (UTC)Reply

Edit the route map photo

edit

The Land Transport Authority has announced the Punggol extension, which spans 4 stations, from Pasir Ris, to Punggol. Thus, I think the route map photo should be update to reflect the change. The Punggol extension is currently referred to as "Stage 2", along with the Changi Airport extension and other parts not in Stage 1. VoicefulBread66 (talk) 14:00, 10 March 2020 (UTC)Reply

"Interchanges with all lines"

edit

Although the exact route isn't known yet, I beleive the CRI will interchange with the Downtown line at King Albert Park? NemesisAT (talk) 10:37, 4 May 2020 (UTC)Reply

I have the answer to your question. It's a yes. Preconstruction and soil investigations on the CRI is ongoing now and some of these are in two existing stations- King Albert Park and Clementi .[1]Brachy0008 (talk) 01:56, 18 May 2020 (UTC)Reply
Thanks, there was a note on this article about the CRI interchanging with every line except the Circle and somebody removed it, claiming it didn't interchange with Downtown. I've added it back in. NemesisAT (talk) 18:22, 18 May 2020 (UTC)Reply

References

Two future lines

edit

@KN2731: I think it just means the Cross Island Line is one of two future lines, the other being the Jurong Region Line. As the unnamed pink line is still conceptual, I don't think it qualifies. No problem with removing the sentence though. Seloloving (talk) 12:58, 29 May 2022 (UTC)Reply

GA Review

edit
GA toolbox
Reviewing
This review is transcluded from Talk:Cross Island MRT line/GA1. The edit link for this section can be used to add comments to the review.

Reviewer: Mike Christie (talk · contribs) 11:11, 20 March 2023 (UTC)Reply

I'll review this. Mike Christie (talk - contribs - library) 11:11, 20 March 2023 (UTC)Reply

I've copyedited a bit; please revert if you disagree with any of my edits.

  • File:Cross Island Line final and alternate routes across Central Catchment.png and File:MRT Route Map CR.svg are unsourced.
    These are still unsourced. One has no source given; the other does not support the positioning of the line on the map, only the sequence and orientation of the line. Mike Christie (talk - contribs - library) 11:00, 30 March 2023 (UTC)Reply
  • "CRL1" is used but not defined; presumably it means the first phase, but that should be clearer.
  • "EIA" is never defined.
  • "Engineering studies for the new phases have not yet been completed at this stage": "at this stage" is meaningless; we need an "as of" date.
  • "Transport Minister Khaw announced in 2018 that express services were considered not feasible, citing the need to dedicate more infrastructure for extra tracks and additional signalling systems": do you mean that it wasn't considered feasible because it would have required more infrastructure, or because the LTA needed to dedicate more infrastructure to extra tracks for other lines?
    This has not been changed. Mike Christie (talk - contribs - library) 11:00, 30 March 2023 (UTC)Reply
  • There is material in the lead that is not in the body; everything in the lead should also be in the body, per WP:LEAD. (This is why there's no need for citations in the lead in most cases -- it's not wrong to have citations in the lead, but many editors don't cite the lead as it's optional. Up to you; the article can pass GA with citations in the lead.) For example, "Coloured lime on official maps" is not in the body, "58-kilometre" is in the lead but not the body (though it is in the infobox so that's probably OK), and "automated" is only in the lead.
    This is still an issue. Mike Christie (talk - contribs - library) 11:00, 30 March 2023 (UTC)Reply
    Did I fix the issue? Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 23:26, 2 April 2023 (UTC)Reply
  • What does it mean to say that "CR1" is being reserved for the station at Changi terminal 5?

Spotchecks:

  • FN 29 cites "The map also showed the western segment interchanging with existing and under-construction stations including King Albert Park, Clementi and Jurong Pier. The line was shown to terminate at Gul Circle station. The map, along with the virtual exhibition, has since been offline. The LTA explained that the route was a "conceptual alignment" yet to be finalised, with the interchange stations being tentative." Suggest changing "stations including King Albert Park, ..." to "stations: King Albert Park, ..." and add Gul Circle; it's not wrong as you have it but there seems no reason not to mention all four as the source does. I don't see support in the source for the "conceptual alignment" quote.
    The "including" has been removed, but to make that work you have to add Gul Circle. The "conceptual alignment" quote still appears to be unsupported. Mike Christie (talk - contribs - library) 11:11, 30 March 2023 (UTC)Reply
    I removed the “conceptual alignment” quote and added Gul Circle Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 23:27, 2 April 2023 (UTC)Reply
  • FN 5 cites "The proposed full line is expected to have a daily ridership of over one million in the long term". Verified.
  • FN 33 cites "The Phase 3 segment is predicted to have five stations, with tentative stations CR21 and CR24 on the Phase 3 segment interchanging with the Jurong Region line and the East West line. An additional shell station might be built as part of the segment. Engineering studies for the new phases have not yet been completed at this stage." I don't have access to this source; can you cite the supporting text? Incidentally, though it's not a GA issue, you might not be aware that archive links for paid sites often don't work -- the archive link for this one doesn't work for example. You might as well remove archive links that have no content.
    To verify this I need you to post here the text in the source that supports this. Mike Christie (talk - contribs - library) 11:11, 30 March 2023 (UTC)Reply
  • FN 12 cites "a northern route that would run close to the Thomson–East Coast Line, heading west towards Mandai, Sungei Kadut and Gali Batu before terminating at Choa Chu Kang, and a southern route skirting the reserve along Lornie Road. Engineers noted the feasibility of constructing the line through the reserve without impacting the environment, though one said the decision "shouldn’t be just based on transport"." The quote is from Lee Der-Horng, who is better described as an engineering professor rather than as an engineer. The description of the route needs a separate source; this source only covers the response, as far as I can see. And I don't see support for "noted the feasibility of" -- what Leung Chun Fai said is that it might be possible, not that it was possible.
    You have "engineering professors", which is wrong; only one said it. I would give each quoted person's name as well, to avoid having to describe both people with the same description. Mike Christie (talk - contribs - library) 11:11, 30 March 2023 (UTC)Reply
  • FN 25 cites "However, the restrictions imposed on construction works due to the COVID-19 pandemic has led to delays and the completion dates for CRL1 and CRLe were pushed by one year to 2030 and 2032 respectively." Verified.
  • FNs 2 & 21 cite "An extension towards Changi Airport Terminal 5 is considered, with " CR1 " being reserved for the station." I have a query above about what this means. Looking at the sources I see "The line may be extended to link up with Changi Airport" but nothing about Terminal 5 or the name of the station.
    You've removed the mention of CR1 but have not addressed the other question; there's nothing I can see in the sources about Terminal 5. Mike Christie (talk - contribs - library) 11:11, 30 March 2023 (UTC)Reply

I am a bit concerned about the number of failed verifications in the spotcheck; three of the six statements I checked don't seem fully supported. Once these are corrected I will check some more. Mike Christie (talk - contribs - library) 13:10, 20 March 2023 (UTC)Reply

Brachy0008, are you planning to work on this? Mike Christie (talk - contribs - library) 02:11, 27 March 2023 (UTC)Reply
Yes. I just forgot. Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 02:13, 27 March 2023 (UTC)Reply
Mike, are you still there? Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 05:33, 28 March 2023 (UTC)Reply
Yes -- let me know when you've fixed the issues above and I'll check your fixes. Mike Christie (talk - contribs - library) 09:38, 28 March 2023 (UTC)Reply
I fixed the issues above already Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 23:52, 29 March 2023 (UTC)Reply
I've responded above. Mike Christie (talk - contribs - library) 11:11, 30 March 2023 (UTC)Reply
Fixed more issues Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 06:44, 2 April 2023 (UTC)Reply

Brachy0008, I'm a bit baffled by your responses. Are you interested in working on the remaining issues? The last two edits you made changed "Engineering professors" to "Engineering professor Lee Der-Horng", which is OK in itself but leaves the rest of the sentence in a mess since "one said" now has no referent; and removed the mention of the extension which seems odd given that the source does support it. There are several other unfixed problems above. Are you planning to fix them? Mike Christie (talk - contribs - library) 14:20, 2 April 2023 (UTC)Reply

I’m trying my best to fix them Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 23:21, 2 April 2023 (UTC)Reply
OK, that's fine then. Let me know if you need further explanations on any of the points I raised. Mike Christie (talk - contribs - library) 23:27, 2 April 2023 (UTC)Reply
No need, have you checked the issues yet? Because I might have deleted some issues and fix some others. Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 04:58, 4 April 2023 (UTC)Reply
OK, I will take another look through, probably tonight. Most nominators either reply at the end of the list to say everything is resolved, so the reviewer knows they need to go and recheck everything; or else they reply after each point, saying it's resolved or if there are questions. That way the nominator knows what to check. For a short list of problems like this I have no problem rechecking everything, but if you nominate more articles it's a good idea to respond that way as it makes it easy for your reviewer to figure out what's been deal with. Mike Christie (talk - contribs - library) 10:32, 4 April 2023 (UTC)Reply

Remaining issues

edit

Since it's not clear what's been fixed and what hasn't, I'll repost below anything that I think is still an issue. Could you respond below each point you've fixed so I know when to take another look? Or if you've fixed everything just let me know that.

  • "However, Transport Minister Khaw announced in 2018 that express services were considered not feasible, citing the higher cost needed to build extra tracks and additional signalling systems that can affect non-express commuters and existing lines." This has been changed but I don't understand what the new phrase is supposed to mean. Can you clarify?
  • File:Cross Island Line final and alternate routes across Central Catchment.png -- one source given is this; I think the pink and blue lines are supposed to be the alternate and final routes, but that source doesn't say that. The other source doesn't appear to be relevant.
  • File:MRT Route Map CR.svg is sourced to this but has a lot of details not on that map.
  • "It will be the sixth MRT line to be completely automated and driverless, as well as the fourth high capacity MRT line." This is unsourced.
  • Most of the first paragraph under "Route" is unsourced.
  • Please check the lead again to make sure that everything in the lead is in the body. The word "lime" to describe the colour that will be used is still only in the lead, for example. I haven't checked everything in the lead; please let me know when you're sure it's all in the body and I'll check again.
    I see you've cited everything in the lead; that's fine, but just FYI, there's no requirement to do that. The requirement is that if you say something in the lead, the same information must be in the body. That's why leads don't need to be cited because there has to be a citation in the body. Looking through the lead, I see "Nevertheless, the Government ultimately decided after years of assessments and deliberation to continue with the original direct route in 2019, citing commuting time and economic factors as well as long-term energy consumption." I don't see support for the second half of this in the body. In the body it just says that the direct route was chosen and lists mitigating factors. Mike Christie (talk - contribs - library) 11:06, 12 April 2023 (UTC)Reply
  • The last two edits you made changed "Engineering professors" to "Engineering professor Lee Der-Horng", which is OK in itself but leaves the rest of the sentence in a mess since "one said" now has no referent; and removed the mention of the extension which seems odd given that the source does support it.
  • FN 33 cites "The Phase 3 segment is predicted to have five stations, with tentative stations CR21 and CR24 on the Phase 3 segment interchanging with the Jurong Region line and the East West line. An additional shell station might be built as part of the segment. Engineering studies for the new phases have not yet been completed at this stage." I don't have access to this source; can you cite the supporting text? Incidentally, though it's not a GA issue, you might not be aware that archive links for paid sites often don't work -- the archive link for this one doesn't work for example. You might as well remove archive links that have no content.
    See below for a revised version of this question. Mike Christie (talk - contribs - library) 11:06, 12 April 2023 (UTC)Reply

When these are fixed I will read through again. Mike Christie (talk - contribs - library) 22:03, 5 April 2023 (UTC)Reply

Quoting FN 33: "Phase three will be about 13km long and consists of at least four stations between Jurong and Tuas, of which two will be interchanges. An integrated train and bus depot in Tuas will be built. There are provisions for a fifth MRT station along this stretch, although this may be a shell structure... One of the proposed interchanges for phase three, labelled CR21... is expected to connect with the upcoming Jurong Region Line (JRL), the other proposed interchagned, labelled CR23, is slated to link up with the East-West Line (EWL and appears to be the western terminus... The map, which was later taken down, showed "conceptual alignments" for the two phases" Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 06:22, 9 April 2023 (UTC)Reply
This doesn't appear to support the "Engineering studies..." sentence, and I think the wording in the article doesn't make it clear that the plan is for four or five stations -- the article says there will be five and then mentions an additional one without making it clear this is one of the five. Mike Christie (talk - contribs - library) 11:45, 9 April 2023 (UTC)Reply
The Engineering studies FN isn’t 33. Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 00:45, 10 April 2023 (UTC)Reply
I can clarify the changed statement. I meant that the express services are costly and can affect non-express services and other lines. Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 01:10, 10 April 2023 (UTC)Reply
There is relevance to the image. There should be a section that says “Alignment Options for CRL”. Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 01:12, 10 April 2023 (UTC)Reply
Mike
?
Brachy08 (Never Gonna Give You Up, Never Gonna Let You Down) 01:28, 12 April 2023 (UTC)Reply
Hi -- sorry, it's been a very busy few days and I've only had the odd moment for Wikipedia. I will definitely have more time on Thursday, but I hope to get to this before then. Mike Christie (talk - contribs - library) 01:42, 12 April 2023 (UTC)Reply
Ok Brachy08 (Let’s Have A Kiki, I Wanna Have a Kiki) 03:16, 12 April 2023 (UTC)Reply
P.S. Notice anything about my signatures? Brachy08 (Let’s Have A Kiki, I Wanna Have a Kiki) 10:24, 12 April 2023 (UTC)Reply

Re FN 33: that comment dates back to this version, in which FN 33 covers the "Engineering studies..." sentence too. Looking at the text now, it's divided into three sentences, each separately cited; what used to be FN 33 is now FN 36 and FN 38. Footnote numbers below refer to this version (the current version):

  • FN 37 cites "It is projected that the second and third phases will be about 14 kilometres (8.7 mi) and 13 kilometres (8.1 mi) long respectively." I can see enough of this for Google to translate "As for the second phase of the project, based on the total length of the cross-island line of 56 kilometers, this phase is expected to be about 14 kilometers long", which supports the second phase. It looks like you're determining the length of the third phase by subtracting 29 and 14 from 56; is that correct? Normally I think that would be OK, but I also see "For the next two phases of the route, the Land Transport Bureau did not disclose the total length of the cross-island line when it was inquired. It only said that the second and third phases of the route have not yet been finalized, and the location of the subway station can only be determined after an in-depth engineering study is completed." This appears to say that the total length is uncertain. This (the old FN 33) which you quoted above supports the 13 km length so I would suggest adding that as a supporting citation.
  • FN 38 cites "The Phase 3 segment is predicted to have four stations, with tentative stations CR21 and CR23 on the Phase 3 segment interchanging with the Jurong Region line and the East West line." Verified per the quote you give above.
  • FNs 36 & 39 cite "An additional shell station might be built as part of the segment. As of 20 February 2022, engineering studies for Phase 3 have not yet been completed." The "as of" date should be September 2022; the date of the news release.

I've struck the points above in this section that are dealt with; the unstruck ones are still issues. I will do some more spotchecks next. Mike Christie (talk - contribs - library) 11:06, 12 April 2023 (UTC)Reply

More spotchecks; footnote numbers refer to this version:

  • FN 3 cites: "At least half of the CRL stations are to interchange with existing lines, providing alternative routes for commuters." The source says "almost half", not at least half.
  • FN 27 cites "However, the restrictions imposed on construction works due to the COVID-19 pandemic have led to delays and the completion dates for CRL1 and CRLe were pushed by one year to 2030 and 2032 respectively." You don't explain what CRLe is (it appears to be the Punggol extension). The source says construction has been delayed by "up to a year", so I don't think we can say the dates were pushed by "one year" -- it could have been less than a full year, since Ong Ye Kung's answers apply to three different lines. I think the simplest answer would be to change the sentence to "pushed to 2030 and 2032 respectively". That's the same phrase used in the source, but I think that's OK.
  • FN 35 cites: "Based on tender documents, The Straits Times projected in February 2022 that civil works for the CRL might be completed by end-2033, with operations beginning in 2034 or later. The CRL is to be completed in three phases." The source is the LTA, not The Straits Times. I don't see a February 2022 date in the source either, and the content doesn't support the sentence.

I'm going to stop there and fail the article, mostly because of these spotchecks, though there are still other unfixed issues listed above. The spotcheck has to be passed for a GA to be promoted, and of the three I checked, one is completely unsupported, and the other two have errors, though not as serious. Before you nominate this again, please go through each sentence and make sure that everything is fully supported. You might want to enlist the help of another editor familiar with Singapore MRT articles, such as ZKang123. Mike Christie (talk - contribs - library) 11:25, 12 April 2023 (UTC)Reply

Wait what I didnt even nominate this article nor even wanted to put this to GA. This article is far from ready, even the line in question is still under construction and information is subject to massive changes. ZKang123 (talk) 00:22, 13 April 2023 (UTC)Reply

Rolling Stock article

edit

so what is the reason never create an article about the rolling stock? Because the rolling stock* tender as been announced but no article create, so when it will be create? 138.75.127.90 (talk) 17:10, 21 June 2023 (UTC)Reply

Request it for WP:AfC instead, and fix your English. Brachy08 (Talk)(Contribs) 06:20, 12 July 2023 (UTC)Reply
It would not be created for now, as it fails WP:GNG. Brachy08 (Talk)(Contribs) 06:26, 12 July 2023 (UTC)Reply
Oh apologize, as I never see the word before I post it, sorry about that. 138.75.70.139 (talk) 16:32, 3 August 2023 (UTC)Reply
The rolling stock article currently exists as a redirect (CRRC Qingdao Sifang CR151), feel free to convert it to an article once more information (and reliable sources) are available. Currently as it stands (tender announcement), the coverage in the article's "Rolling stock" section is sufficient. R22-3877 (talk) 09:57, 12 July 2023 (UTC)Reply
Oh. (I'll leave it as a redirect for now, until more information comes out. I wouldn't want to risk it getting XfD'd. Brachy08 (Talk)(Contribs) 00:40, 13 July 2023 (UTC)Reply

Now the draft article is created, can post it on the main article? 138.75.124.152 (talk) 11:16, 5 December 2023 (UTC)Reply

138.75.124.152: The draft article still needs to be reviewed and published as a main namespace article. See MOS:DRAFTNOLINK for why I reverted your edits for now. Fork99 (talk) 11:28, 5 December 2023 (UTC)Reply
Oh ok sure, thanks for telling me. 138.75.104.214 (talk) 17:56, 7 December 2023 (UTC)Reply