This is the talk page for discussing improvements to the Guri Dam article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
This level-5 vital article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||
|
Copyright?
editThe content here seems to come from [1] and [2] (and perhaps others). The second of these is clearly marked as being copyrighted. Molinari 00:16, 12 May 2005 (UTC)
Incorrect and contradicting production numbers.
editThe first sentence (from the page) has rather ambiguous grammar. I believe the intention is to indicate the kilowatt-hours produced during some period of time, without that it appear in conflict with the next paragraph?
From the page: ------------------
There are two machine rooms with ten generators each producing a total of 87 billion kilowatt-hours of electricity and saves 300,000 barrels of oil a day. The walls in room number two were decorated by the kinetic Venezuelan artist Carlos Cruz-Díez.
The Hydroelectric Power station Guri, was constructed in the Necuima Canyon, 100 kilometers waters above of the mouth of the Caroní River in the Orinoco. The development of Guri in his first stage began in 1963 and was finalized in 1978 with a capacity of 2,065 megawatts in 10 units and with the dam to a maximum level of 215 meters above the level of the sea. The final stage of the dam of Guri concluded in 1986 and allowed to elevate the level of the dam to the maximum level of 272 m a.s.l., being constructed the second power plant that houses 10 units of 630 MW each. At the present Guri moments occupies the second place in hydroelectric plants in the World, with his 10,200 MW of installed capacity total. —Preceding unsigned comment added by 74.7.217.10 (talk) 20:21, 10 October 2008 (UTC)
Sources Needed
editWHERE IS THE SOURCE FOR THE INFORMATION CONCERNING THE ONGOING CONTROVERSY? —Preceding unsigned comment added by 161.226.241.5 (talk) 17:47, 6 July 2009 (UTC)
- That issue is meaningless now, in view of the national attention the dam got when its reservoir water level descended to a dangerous low, due to a prolonged drought. --AVM (talk) 20:52, 21 April 2016 (UTC)
External links modified
editHello fellow Wikipedians,
I have just added archive links to one external link on Guri Dam. Please take a moment to review my edit. If necessary, add {{cbignore}}
after the link to keep me from modifying it. Alternatively, you can add {{nobots|deny=InternetArchiveBot}}
to keep me off the page altogether. I made the following changes:
- Added archive https://web.archive.org/20070708145727/http://www.edelca.com.ve:80/ to http://www.edelca.com.ve
When you have finished reviewing my changes, please set the checked parameter below to true to let others know.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}}
(last update: 5 June 2024).
- If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
- If you found an error with any archives or the URLs themselves, you can fix them with this tool.
Cheers.—cyberbot IITalk to my owner:Online 21:03, 11 February 2016 (UTC)
Missing and outdated technical information
editThe article is missing a comprehensive description of the turbines that were installed in what seems to have been three distinct stages: their types (Francis, Kaplan, which ones?), their physical characteristics and dimensions, their power ratings, etc. Moreover, the dam and its power generators have been placed in grave danger by relentless exploitation in the face of ever lower water levels, caused by the severe drought from mid-2015 to April 2016. It only takes the contribution of one or more Venezuelan engineers, familiar with the installed power plants. Those turbines have faced the decay of almost two decades of neglect, mismanagement, lack of proper care and maintenance, you name it, as has been the rule with the current --but ailing-- chavista government, compromising the integrity of those huge and expensive equipment and companion installations. The article is lacking a lot of recent information on these subjects. --AVM (talk) 21:10, 21 April 2016 (UTC)
- They are starting power rationing here soon. I will update it if I get some time but anyone is more than welcome.--NortyNort (Holla) 16:58, 23 April 2016 (UTC)
- Hope you can find the time, thanks. (I've not found it myself) --AVM (talk) 18:39, 15 June 2016 (UTC)
- AVM Re: "It only takes the contribution of one or more Venezuelan engineers"... first of all, man, you know how old they are now? I know one, but he has Alzheimers.
- And as far as hoping on NortyNort: He has way more problems than you power problems AND time problems, while you seem to have "only" no time (to paraphrase you). I am shaking my head.--Wuerzele (talk) 21:23, 15 June 2016 (UTC)
- User:Wuerzele PLS do not misinterpret me. I was not referring to the original engineers who took part in the project of building the Guri dam and taking care of its initial provisioning of power turbines & ancillary installations, but to any engineers who might be familiar with the current status of that huge construction and its workings. About User:NortyNort, despite his ample knowledge in the subject of power dams, I notice he's (sadly) no Venezuelan engineer, nor does he appear to be particularly familiar with Venezuela's electric industry, so I hardly think we should have him in mind to come to the rescue. I'll see what I can do, but whatever description of the current issues I can build, it'll always be the target of Venezuelan pro-regime vandals obstinate in defending their "leaders", the scum that has destroyed most of the former civilization there was in the country. Regards, --AVM (talk) 17:08, 16 June 2016 (UTC)
- I have been rather busy in life lately. I took a look back in April but didn't come up with much. The best was this page at the Global Energy Observatory. It is a wiki-esque site but has references down at the bottom that are valuable. The Power-Technology article is alright but apparently is black-listed for some stupid reason. I see more good info on the commissioning was added recently. Unfortunately, as well, Venezuela is a somewhat closed-off country. It had been hard to track progress on the Tocoma Dam.--NortyNort (Holla) 17:34, 16 June 2016 (UTC)
- User:Wuerzele PLS do not misinterpret me. I was not referring to the original engineers who took part in the project of building the Guri dam and taking care of its initial provisioning of power turbines & ancillary installations, but to any engineers who might be familiar with the current status of that huge construction and its workings. About User:NortyNort, despite his ample knowledge in the subject of power dams, I notice he's (sadly) no Venezuelan engineer, nor does he appear to be particularly familiar with Venezuela's electric industry, so I hardly think we should have him in mind to come to the rescue. I'll see what I can do, but whatever description of the current issues I can build, it'll always be the target of Venezuelan pro-regime vandals obstinate in defending their "leaders", the scum that has destroyed most of the former civilization there was in the country. Regards, --AVM (talk) 17:08, 16 June 2016 (UTC)
- Hope you can find the time, thanks. (I've not found it myself) --AVM (talk) 18:39, 15 June 2016 (UTC)
External links modified
editHello fellow Wikipedians,
I have just modified 2 external links on Guri Dam. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
- Added archive https://web.archive.org/web/20131220095022/http://www.industcards.com/hydro-venezuela.htm to http://www.industcards.com/hydro-venezuela.htm
- Added archive https://web.archive.org/web/20090603025136/http://www.covenpre.org.ve/presas/guri.htm to http://www.covenpre.org.ve/presas/guri.htm
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}}
(last update: 5 June 2024).
- If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
- If you found an error with any archives or the URLs themselves, you can fix them with this tool.
Cheers.—InternetArchiveBot (Report bug) 07:42, 26 October 2017 (UTC)
Size of power plant
editI have moved the following paragraph from the article page:
"The total projected hydroelectric capacity is 10,235 megawatts, one of the largest in the world."
I have found sources that give the power producing capacity of the power plant as 10,025MW[3], 10,200MW[4], 10,235 MW[5], and 10,300MW[6]. I cannot vouch for the reliability of each source, so there needs to a discussion of which source to use, or if the article needs to be somewhat vague as to how much power the plant produces. - Donald Albury 20:59, 12 August 2018 (UTC)
Embalse de Guri
editSince es:Embalse de Guri (Guri Reservoir) "is one of the largest on earth," I've added a Template:Ill to the Spanish article, as I have stated in my Edit Summaries and attempted to delete the previous redirect. X1\ (talk) 22:21, 14 March 2019 (UTC)
(X1\ moved from X1\'s Talk page)
- Hello, I'm Wgolf. I wanted to let you know that one or more of your recent contributions to Guri Reservoir have been undone because they did not appear constructive. If you would like to experiment, please use the sandbox. If you have any questions, you can ask for assistance at the Help Desk. Don't blank out a page that someone else made. Wgolf (talk) 22:06, 14 March 2019 (UTC)
- @Wgolf: what do you suggest is the best course to not have a circular redirect to here? X1\ (talk) 22:28, 14 March 2019 (UTC)
- I'm not sure, you might want to ask an admin for that. Wgolf (talk) 22:29, 14 March 2019 (UTC)
- @Wgolf: what do you suggest is the best course to not have a circular redirect to here? X1\ (talk) 22:28, 14 March 2019 (UTC)