Talk:London Underground 1995 Stock

Latest comment: 2 years ago by 49.204.142.79 in topic The Extension Of Northern Line's Battersea Branch

Untitled

edit

Please see the discussion on Talk:London Underground 1996 Stock, as well as p13 and p15 of London Underground's official rolling stock guide [1], re the traction control systems on the two train types. In short, the 1995 stock is *newer* in traction control design terms than the 1996 stock, despite the nominal dates carried by both train types.--Stalinism 12:26, 21 June 2006 (UTC)Reply

Hmm, generally OK but a few additions needed

edit

Not got time right now, but i'll be updating the info surrounding build and commissioning dates, also the differences to the Jubilee stock, which are in fact significant. Rather, tho only common parts are the floor extrusion, carbody doors and mechanism and shoegear. Everything else is different to some degree... —Preceding unsigned comment added by Jubileebloke (talkcontribs) 14:57, 8 October 2008 (UTC)Reply

CIS Upgrade

edit

Apparently certain 1995TS trains are being upgraded with a new series of DVA announcements, as seen here [2] and here [3]. I'm looking into adding it to the article. Brooks630 (talk) 23:37, 28 April 2016 (UTC)Reply

This isn't really encyclopedic, and YouTube is not what we call a reliable source. --Redrose64 (talk) 09:57, 29 April 2016 (UTC)Reply
edit

Hello fellow Wikipedians,

I have just modified one external link on London Underground 1995 Stock. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 13:28, 25 May 2017 (UTC)Reply

The Extension Of Northern Line's Battersea Branch

edit

Battersea Branch started the service on 2021.
Station Opening:

  • Nine Elms - September 2021
  • Battersea Power - September 2021
  • Clapham Junction - December 2025.

— Preceding unsigned comment added by 49.204.142.79 (talk) 11:52, 1 December 2021 (UTC)Reply